Project location
Country and customer market for the published project.
Explore HENGDE lightweight block, wall-panel, production-line and equipment-upgrade projects across different markets.
Delivery lead time: 40–50 working days.

Explore HENGDE equipment at customer factories and follow the work from factory visits and shipments to installation, production and later line upgrades.

The project moved from a factory visit and contract signing in April to equipment loading on 7 July 2026.

Project photos show connected cutting and wall-panel grooving equipment at the customer site.

This 200 m³/day project shows mould circulation, cutting and finished EPS lightweight blocks at the customer site.

The project includes installation, operator support and operating-site equipment for a 100 m³/day foam-concrete block line.

This 100 m³/day lightweight foam-concrete block line includes mixing, mould handling and block cutting at the customer site.

The Bishkek project shows cutting equipment, moulds and finished blocks for a planned 100–200 m³/day production range.

This Kyrgyzstan project shows mould handling and finished blocks for a 100 m³/day automated line basis.

The Hubei project combines the factory layout, cutting equipment and finished wall panels in one production line.

This retrofit connects an existing six-metre-mould AAC line with a new self-insulating block product direction.

This Zhejiang project upgrades the cutting machine on an existing ceramsite block line and shows the resulting cut products.

The Inner Mongolia project shows connected line equipment, mould handling and finished NAAC blocks for a 300 m³/day design basis.

HENGDE manufactured and shipped the equipment for this foam-concrete wall-panel line.

Site work includes foundation preparation, feeding-platform installation, cutting-system work and downstream handling installation.

The Wuhai project includes connected production equipment, a three-station cutting system and the mixing-and-pouring section.

The Guyuan project combines cutting equipment, curing moulds and finished lightweight blocks on a 200 m³/day line basis.

This Aksu project uses the existing factory for a simplified self-insulating block retrofit with a 100 m³/day project basis.

The Tacheng project shows product measurement, finished self-insulating blocks and equipment loading for a cutting-system upgrade.

The Kashgar project replaces an older circular-saw process and shows the installed cutting equipment, blocks at the machine and finished products.

HENGDE completed equipment manufacturing, factory testing and dispatch for this self-insulating block line.

HENGDE configured new automation and cutting-process equipment around the customer's existing mould-forming lightweight block line before shipment.

The Côte d’Ivoire project progressed from equipment delivery into site installation. Published work includes positioning, rail installation, equipment connection and core assembly.

HENGDE worked with the Dunhuang customer on a production-line plan for lightweight blocks and homogeneous self-insulating blocks.

HENGDE and the Inner Mongolia customer planned a large lightweight-block production line around locally available mineral resources.

HENGDE developed a cutting-system retrofit for the customer’s existing factory in Wuwei.

HENGDE supplied the self-insulating-block production equipment for this Russian customer project.

HENGDE upgraded the customer’s existing lightweight-block line in the Philippines, focusing on the cutting process and its connection to the factory’s retained equipment.

HENGDE self-insulating-block equipment is in production at the Alar customer factory in Xinjiang.

The Pishan customer in Hotan, Xinjiang uses a HENGDE line to manufacture homogeneous self-insulating blocks.

The Shache customer in Xinjiang manufactures self-insulating blocks with HENGDE production equipment.

HENGDE self-insulating-block equipment supports the customer’s factory in Wensu, Xinjiang.

HENGDE supported the Shaanxi self-insulating-block project through equipment installation, commissioning and operator training into production.

The Henan customer selected a HENGDE line for reinforced lightweight wall panels.

The Kazakhstan customer first ordered equipment to upgrade an existing block factory, then returned to HENGDE to add an automated cutting line.

This Malaysia lightweight block project is documented from local-material testing and factory planning through agreement and equipment shipment on August 25–26, 2026.

HENGDE and the Xichang customer planned a lightweight-block factory with a target output of 400 m³/day.

The Hubei customer selected HENGDE equipment for an exterior-wall insulation-board project after visiting the factory and reviewing the process.

The Nepal customer ordered a HENGDE lightweight-wall-panel line for a 1.2-metre panel product.

The Timor-Leste customer selected a HENGDE lightweight-block line after a multi-day factory evaluation.

HENGDE non-autoclaved lightweight-block equipment is shown during installation at the Laos customer site.

HENGDE upgraded the cutting section of the customer’s existing block factory in Bazhong, Sichuan.

The Hejing customer adapted an existing AAC factory for self-insulating-block production.

The Aksu project produces EPS self-insulating blocks using local mountain sand, with a 1000 m³/day project design basis.

HENGDE self-insulating-block equipment is in production at the Ili customer factory in Xinjiang.

The Bole customer in Bortala, Xinjiang established an EPS self-insulating-block factory with HENGDE equipment.

The Jiangxi customer uses HENGDE equipment to manufacture water-resistant lightweight wall panels.

The Urumqi customer manufactures homogeneous self-insulating blocks with HENGDE production equipment.

HENGDE cutting equipment forms part of the customer’s ceramsite lightweight-wall-panel project in Hainan.

The Liaoning customer manufactures foam-concrete blocks with HENGDE production equipment.

HENGDE configured a lightweight-wall-panel line for the Shaoguan customer’s 1.5 m × 1.25 m × 0.10 m panel product.

This Albania customer selected HENGDE after a multi-day factory evaluation and equipment discussion.

The Ethiopia customer reviewed HENGDE equipment and wall-material samples before signing a gypsum block production-line project.

The Yuyao customer adapted an existing AAC line for ceramsite blocks. Project photos show cutting equipment, block handling and finished products at the factory.

This Hunan project explores iron-tailings use in wall materials. Customer-site photographs show material handling equipment, blocks and the factory setting.

A DR Congo property-development customer signed a HENGDE lightweight block project after factory inspection and a cutting demonstration in October 2026.

An August 2026 case records a separate DR Congo customer’s agreement for a Phase-I lightweight block line planned at 100 m³ per day.

A Ghana property-development customer selected a multifunctional HENGDE line for lightweight blocks and partition panels; the source record includes shipment and installation stages.

HENGDE’s Xinjiang retrofit case documents a move from square moulds towards long mould boxes, alongside changes to the cutting and handling route.

A separate Côte d’Ivoire customer signed for a HENGDE lightweight block line on 23 October 2025; the published case includes equipment shipment and installation records.

A separate Indonesian customer’s case brings together equipment selection, manufacturing, delivery, installation and production records for a lightweight block line with dual-channel cutting.
Compare the market, finished product, equipment scope and current project stage with your own factory plan.
Country and customer market for the published project.
Lightweight blocks, wall panels, self-insulating products or a cutting-system upgrade.
The production equipment shown for manufacturing, installation, shipment or operation.
Factory test, shipment, installation, commissioning, production or equipment upgrade.
Use the closest example as a starting point, then confirm your materials, output and site conditions.
Share your target product, raw materials, planned output and project location so HENGDE can review the relevant line modules.

Tell us your product, raw materials, target output and project country so we can review the suitable production route.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.