ABOUT HENGDE

About HENGDE

Guangzhou Hengde Construction Technology Co., Ltd. engineers and manufactures complete lightweight block and wall-panel production systems. We bring raw-material testing, factory planning, equipment manufacturing, installation and operator training together in one delivery team.

Delivery lead time: 40–50 working days.

Customers viewing HENGDE equipment during a manufacturing workshop visit
Customers viewing HENGDE equipment during a manufacturing workshop visit

A manufacturer with production-line engineering at its core

01
COMPANY INTRODUCTION

Guangzhou Hengde Construction Technology Co., Ltd. (HENGDE) designs and manufactures complete lightweight block and wall-panel production lines. Established in 2014, HENGDE coordinates equipment manufacturing at its Foshan, Guangdong, China base with raw-material testing, factory layout, installation, commissioning and operator training.

See the equipment being built

03
FACTORY & MANUFACTURING

Real views from the HENGDE manufacturing workshop.

HENGDE technician fabricating an equipment frame inside the workshop
01

Equipment fabrication

Frames and connected equipment are prepared for the specified production process.

HENGDE cutting and handling equipment under assembly in the workshop
02

Factory assembly

Cutting, transfer and handling equipment are assembled and aligned in the manufacturing workshop.

HENGDE technician working at the equipment control panel during factory checks
03

Controls and equipment checks

Technicians check the controls and equipment operation as part of factory preparation.

Develop the process and the equipment together

04ENGINEERING & R&D

Engineering starts from the target product, raw materials, capacity and factory conditions. HENGDE coordinates equipment interfaces, material flow, cutting, handling and controls as one production system.

HENGDE technician testing the equipment control panel beside an open electrical cabinet
Controls testing at the HENGDE workshop

Listed drafting organization for JC/T 1062-2022

05VERIFIED STANDARDS PARTICIPATION

The National Digital Standards Library lists Guangzhou Hengde Construction Technology Co., Ltd. (广州恒德建筑科技有限公司) among the drafting organizations of the current Chinese building-material industry standard JC/T 1062-2022, Foamed Concrete Blocks. Drafting participation is evidence of standards work; product conformity and project performance still require the applicable test and acceptance records.

  • Current building-material industry standard: JC/T 1062-2022
  • Published 30 September 2022; implemented 1 April 2023
  • Scope: foamed-concrete blocks for industrial and civil buildings

Start with the materials available to your factory

06RAW MATERIAL & FORMULA SUPPORT

HENGDE develops the process around your local raw materials. Our engineers use material assessment and trial batches to establish the formulation, dosing, mixing sequence and curing plan. The results guide equipment selection and give your production team a clear starting point for operation.

  • Material Review
  • Trial Formula
  • Process Adjustment
Customer team reviewing a lightweight block sample at the Indonesia project
Customer block-sample review — Indonesia project

From Factory Manufacturing to Site Production

07GLOBAL PROJECT DELIVERY

HENGDE supports project delivery from manufacturing and factory checks to packing, shipment, installation, commissioning and operator training.

HENGDE technician fabricating an equipment frame in the workshop
Equipment manufacturing — HENGDE workshop
Wrapped HENGDE equipment loaded inside a shipping container for the Indonesia project
Container loading — Indonesia project
Customer operators receiving equipment instruction at the Indonesia project
Operator training — Indonesia project

Built through equipment development and real projects

08DEVELOPMENT HISTORY

Six milestones from HENGDE’s company archive.

  1. 2014

    HENGDE began research, development and manufacturing of lightweight wall-material production equipment.

  2. 2017

    Technical cooperation with a German technology partner introduced CLC wall-material production processes into HENGDE’s development work.

  3. 2019

    The Foshan base expanded equipment R&D, standardized manufacturing and the technical and after-sales teams.

  4. 2021

    The Xinjiang branch supported expansion into self-insulating wall materials, product sales and equipment manufacturing.

  5. 2022–2023

    Development continued across cutting, stacking, packaging and mixing systems, supported by the company’s patent archive.

  6. 2024

    The company history records an application for high-tech enterprise recognition in 2024.

HENGDE manufacturing base building exterior in Foshan
Foshan manufacturing base
International technical cooperation visit shown in HENGDE’s 2017 archive
2017 — International technical cooperation
Utility-model patent certificates in HENGDE’s 2022–2023 company archive
2022–2023 — Equipment patent archive

Prepare the people as well as the production line

10
INSTALLATION & TRAINING

HENGDE guides equipment positioning, connection and commissioning, then trains operators in production, routine checks and maintenance. We establish the installation, training and spare-parts plan with your team before delivery.

Visit HENGDE and discuss your production project

11
CONTACT / FACTORY VISIT

Tell us your country, intended product and the equipment you want to review. Arrange the visit date and demonstration scope with our team.

Discuss Your Project with HENGDE

DISCUSS YOUR PROJECT

Tell us your project country and intended product, or arrange a visit to the manufacturing base.

Contact HENGDE

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.