
Equipment fabrication
Frames and connected equipment are prepared for the specified production process.
Guangzhou Hengde Construction Technology Co., Ltd. engineers and manufactures complete lightweight block and wall-panel production systems. We bring raw-material testing, factory planning, equipment manufacturing, installation and operator training together in one delivery team.
Delivery lead time: 40–50 working days.

Guangzhou Hengde Construction Technology Co., Ltd. (HENGDE) designs and manufactures complete lightweight block and wall-panel production lines. Established in 2014, HENGDE coordinates equipment manufacturing at its Foshan, Guangdong, China base with raw-material testing, factory layout, installation, commissioning and operator training.
Complete lines, specialist cutting equipment and connected process modules.
CLC / foam concrete, NAAC, EPS self-insulating and ceramsite products are process and product options within the block family.
02Panel systems are configured around geometry, reinforcement, moulds, curing and the required finishing process.
03Horizontal and vertical cutting, slotting, stacking and transfer systems can be integrated into an existing factory.
Real views from the HENGDE manufacturing workshop.

Frames and connected equipment are prepared for the specified production process.

Cutting, transfer and handling equipment are assembled and aligned in the manufacturing workshop.

Technicians check the controls and equipment operation as part of factory preparation.
Engineering starts from the target product, raw materials, capacity and factory conditions. HENGDE coordinates equipment interfaces, material flow, cutting, handling and controls as one production system.
The National Digital Standards Library lists Guangzhou Hengde Construction Technology Co., Ltd. (广州恒德建筑科技有限公司) among the drafting organizations of the current Chinese building-material industry standard JC/T 1062-2022, Foamed Concrete Blocks. Drafting participation is evidence of standards work; product conformity and project performance still require the applicable test and acceptance records.
HENGDE develops the process around your local raw materials. Our engineers use material assessment and trial batches to establish the formulation, dosing, mixing sequence and curing plan. The results guide equipment selection and give your production team a clear starting point for operation.
HENGDE supports project delivery from manufacturing and factory checks to packing, shipment, installation, commissioning and operator training.
Six milestones from HENGDE’s company archive.
HENGDE began research, development and manufacturing of lightweight wall-material production equipment.
Technical cooperation with a German technology partner introduced CLC wall-material production processes into HENGDE’s development work.
The Foshan base expanded equipment R&D, standardized manufacturing and the technical and after-sales teams.
The Xinjiang branch supported expansion into self-insulating wall materials, product sales and equipment manufacturing.
Development continued across cutting, stacking, packaging and mixing systems, supported by the company’s patent archive.
The company history records an application for high-tech enterprise recognition in 2024.
Explore published installations, shipments and production-stage projects.
HENGDE guides equipment positioning, connection and commissioning, then trains operators in production, routine checks and maintenance. We establish the installation, training and spare-parts plan with your team before delivery.
Tell us your country, intended product and the equipment you want to review. Arrange the visit date and demonstration scope with our team.
Tell us your project country and intended product, or arrange a visit to the manufacturing base.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.