200 m³/day CLC Block Production Line

Plan the mixing, mould circulation, curing, cutting and handling stages around your block and factory. Start with the equipment configuration and layout, then define the supply scope.

Delivery lead time: 40–50 working days.

200 m³/dayDesign basis, not an unconditional guarantee of saleable output. Confirm the shift plan, mould circulation and production conditions against the same configuration version.
01 / 03

THE LINE, AS A CONNECTED PROCESS

See how the equipment
fits together.

Review material flow, mould circulation, cutting and finished-product handling on the engineering layout.

View the original layout image ↗
Engineering layout of the 200 m³/day lightweight block line

ENGINEERING LAYOUT — NOT A PRODUCTION PHOTOGRAPH · Engineering illustration, not a factory photograph.

Open original drawing ↗

Illustrated arrangement for the 200 m³/day project discussion. The final equipment schedule and site layout must refer to the same approved configuration.

FROM MATERIAL TO FINISHED BLOCK

Follow the production.

Six connected stages. Scroll to see the equipment behind each step, or select a stage.

CLC mixing equipment at the HENGDE Albania project
CLC mixing equipment at the HENGDE Albania project
01 / 06

Process examples from HENGDE equipment and project records. Photographs do not all show one factory or one configuration.

01 / PRODUCTION

Mixing

Metered solids, water and preformed foam enter the selected mixer.

CLC mixing equipment at the HENGDE Albania project
02 / PRODUCTION

Pouring

The mixed material is discharged into the mould circulation line.

Mixed material discharged from the mixer outlet into a mould during a HENGDE material trial
03 / PRODUCTION

Curing

Mould circulation and curing are matched to the product and site conditions.

Curing moulds at the Guyuan 200 cubic metre project
04 / PRODUCTION

Demoulding

Release and transfer the green body at the required handling condition.

HENGDE lightweight block demoulding and transfer process
05 / PRODUCTION

Cutting

The cutting sequence follows the product dimensions and green-body condition.

CLC block cutting equipment at the HENGDE Albania project
06 / PRODUCTION

Stacking

Transfer and stack the cut products for the next handling stage.

Stacking clamp beside finished lightweight blocks in a HENGDE factory

EQUIPMENT BY PRODUCTION STAGE

Equipment, by its job
on the line.

Existing HENGDE catalogue equipment, organized by function. The project-specific equipment schedule defines the final supply scope.

Screw feeder

Screw feeder

Moves compatible powder materials from storage toward the metering section.

View equipment →
Belt conveyor

Belt conveyor

Connects compatible bulk-material feeding with the preparation and metering stage.

View equipment →
Conveyor-linked metering hopper

Conveyor-linked metering hopper

Buffers and meters compatible material between conveying and batch preparation.

View equipment →
Powder metering system

Powder metering system

Measures the confirmed powder input for each production batch.

View equipment →
Water metering system

Water metering system

Stores and releases the confirmed water quantity for the controlled batch.

View equipment →
Physical foaming machine

Physical foaming machine

Prepares physical foam for a confirmed CLC foam-concrete route; it is not an aluminium-powder NAAC machine.

View equipment →
Piston / screw air compressor

Piston / screw air compressor

Supplies compressed air to the confirmed foaming and pneumatic scope; the 50 and 100 m³/day references use different variants.

View equipment →
Operation platform

Operation platform

Supports the feeding, metering and mixing arrangement; approved engineering drawings specify customer-supplied steelwork.

View equipment →
Horizontal mixer variants

Horizontal mixer variants

Combines the confirmed solids, water and route-specific lightweight constituent according to the approved batch sequence.

View equipment →
Demoulding crane

Demoulding crane

Separates and lifts the mould or green product at the confirmed demoulding condition.

View equipment →
Peeling machine

Peeling machine

Removes the confirmed surface layer before dimensional cutting or finishing.

View equipment →
Block lifter

Block lifter

Lifts or grips blocks according to the confirmed product condition and transfer sequence.

View equipment →
Lifting & stacking machine

Lifting & stacking machine

Lifts and stacks finished product according to the approved handling pattern.

View equipment →
Transfer and mould-circulation systems

Transfer and mould-circulation systems

Covers capacity-specific transfer-cart or mould-circulation sections without merging their models or parameters.

View equipment →
Demoulding line

Demoulding line

Provides powered movement through the listed demoulding station.

View equipment →
Mould return line

Mould return line

Returns empty moulds for cleaning, preparation and the next pouring cycle.

View equipment →
Pouring line

Pouring line

Moves prepared moulds through the listed pouring position.

View equipment →
Automatic feeding line

Automatic feeding line

Moves confirmed material or carriers through the listed automatic feed stage.

View equipment →
Automatic discharging line

Automatic discharging line

Moves the confirmed carrier or product out of the connected station.

View equipment →
PLC main control cabinet

PLC main control cabinet

Coordinates the confirmed line sequence, interlocks, commands and alarms.

View equipment →
Foaming-machine control cabinet

Foaming-machine control cabinet

Controls the delivered physical-foaming equipment scope.

View equipment →
Remote-control module

Remote-control module

Provides the listed remote command functions for the confirmed controls scope.

View equipment →
Block mould variants

Block mould variants

Forms the lightweight block billet; the delivered geometry follows the selected product.

View equipment →

Match the equipment to your block sizes, raw materials and available space. Get the equipment schedule and layout

REAL MACHINES. REAL PROCESS.

Watch HENGDE equipment
at work.

All factory & project videos
INSIDE THE PROCESS

Material-trial pouring from mixer to mould

Watch mixed material discharge from the mixer into a mould during a HENGDE material trial. Silent excerpt from the original trial footage.

Open the player, then use its play and pause controls. No automatic playback.

Open video ↗

CONNECTED EQUIPMENT AT A CUSTOMER SITE

See the equipment
connected.

Real site photographs illustrate equipment connections. The project record identifies its own scope.

The Xianning record shows connected HENGDE equipment at the customer site. Use it to understand equipment connections and material flow while discussing your own layout.

Connected HENGDE equipment at the Xianning customer site — real project photograph.
Connected HENGDE equipment at the Xianning customer site — real project photograph.

View the Xianning project record

The Ghana wall-panel record documents loading and shipment; its project and equipment scope are separate from this block-line configuration.

View the Ghana equipment shipment

PREPARE YOUR FACTORY PROPOSAL

The details behind
the configuration.

Product, raw materials, site and equipment scope — keep the engineering detail available without losing the production story.

01

Define the block before choosing the equipment

Bring the finished-block specification you intend to sell: dimensions, intended use and any applicable performance requirements. Add your local raw-material information and the purpose of the factory. These inputs guide the process, mould arrangement and cutting system.

The 200 m³/day figure is a design-capacity basis. Shift planning, mould circulation, curing, handling and the proportion of conforming products all affect actual output. The equipment list and these conditions must describe one consistent configuration.

Share the block you plan to make · View the engineering layout

02

Follow the material through the line

  1. Prepare and meter. Organize the incoming materials, storage and metering for the selected process.
  2. Mix. Connect the material inputs and mixing stage to the casting arrangement.
  3. Cast into moulds. Plan the mould arrangement for the product and its movement through the line.
  4. Cure and demould. Allow for the process conditions, mould return and space needed before cutting.
  5. Cut. Match the cutting arrangement to the billet and finished-block specification.
  6. Transfer and stack. Plan handling and storage so products can move away from the cutting stage.

Review the layout with these stages in mind · Explore cutting systems

03

Ask for the equipment list, not just the line name

HENGDE organizes the proposal by production stage, equipment interface and supply responsibility. The final equipment schedule identifies included items, options and customer-prepared work.

Equipment groupWhat the configuration must specifySupply boundary to record
Material preparation and mixingMaterial storage, feeding, metering, mixing and connection to casting.Supplied equipment, site-prepared storage and utility connections.
Moulds and circulationThe product arrangement, mould movement, curing, demoulding and return path.Mould configuration, handling interfaces and any customer-prepared areas.
CuttingBillet dimensions, finished-block specification and the cutting sequence.The cutting equipment, associated handling and any selected options.
Transfer, stacking and controlsHow materials move between stages and how equipment operation is coordinated.Automation scope, interfaces and items provided at the site.

Request the equipment configuration. Have the proposal distinguish included equipment, optional equipment and customer-supplied work.

04

Assess the material you will actually buy

Send the source and available specification of each proposed raw material, photographs and any existing test reports. If samples are sent, label each with the source, batch and sampling date. Keep different sources identifiable instead of combining them into an untraceable sample.

HENGDE reviews material composition, grading, moisture and source consistency, then defines representative sample trials. The trial record identifies mixing, mould filling, curing and finished-product results, giving the configuration discussion a traceable material basis.

Submit raw-material information

05

Give the layout engineer the site inputs that matter

Information to provideWhy it affects the layout
Building dimensions and clear heightThey define the space available for equipment, movement and handling.
Columns, doors and vehicle accessThey affect equipment placement, material delivery and finished-product movement.
Raw-material, curing and finished-product areasThey must connect to the process without treating all floor space as equipment space.
Available electrical supply and waterThe project needs defined connection points and utility requirements for the selected configuration.
Planned work shifts and available rolesThey help define operating responsibilities, handling and the automation discussion.

Ask for the layout, utility requirements and operator responsibilities for the same equipment configuration. Installed power is an equipment specification; it is not a statement of actual electricity consumed per hour.

Discuss the factory layout

06

Keep delivery and site work clearly separated

The equipment delivery lead time is shown above. Shipping, site installation, commissioning and training are specified separately in the project proposal.

For the proposal, identify the equipment supply, shipment arrangements, installation, commissioning, operator training and the work to be prepared by the customer. Discuss the scope, responsibilities and any associated costs before finalizing the project.

Review installation and training

07

Get a configuration that can be discussed line by line

Product specification, raw materials, mould arrangement, cutting method, automation and supply boundaries affect the equipment configuration and quotation. A line name or capacity figure by itself does not define the complete supply.

Start with the short form below. Include the project country, target product and current stage; add the output target, raw-material details or site information when available. Ask for the equipment configuration, factory layout and formal quotation together so you can compare the same scope.

Get a Factory Proposal

YOUR NEXT STEP

Bring your product.
Let’s plan the line.

Get the equipment configuration, factory layout and a formal quotation for your project.

Get a Factory Proposal

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.
Related project or application200 m³/day CLC Block Production Line

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.