Target product and daily output basis
We define the target product, shift hours and design-output basis with your team.
HENGDE engineers the batch rhythm, mould circulation, curing, cutting and logistics together, turning your output target into a workable factory layout.
Delivery lead time: 40–50 working days.

We define the target product, shift hours and design-output basis with your team.
We calculate how batching, mould turnover, curing, cutting and handling affect the line rhythm.
We arrange production, curing and storage areas with access for operators, forklifts and maintenance.
We identify the electrical, water, compressed-air and staffing interfaces for the selected configuration.
A stated shift and cycle-time basis for engineering the line.
A layout connecting equipment positions, mould circulation, curing and material movement.
The supply points and requirements to coordinate with local contractors.
The foundations, access and installation interfaces to prepare before equipment arrival.
Tell us what you plan to produce and where the factory will be built.
HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.
HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.
For recycled or variable inputs, representative samples and production trials establish how that specific source performs.
We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.
The equipment proposal then follows the tested process and the required product, rather than a generic machine list.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.