
Equipment fabrication
Frames and connected equipment are prepared for the specified production process.
Guangzhou Hengde Construction Technology Co., Ltd. engineers and manufactures complete lightweight block and wall-panel production systems. We bring raw-material testing, factory planning, equipment manufacturing, installation and operator training together in one delivery team.
Delivery lead time: 40–50 working days.

Complete lines and specialist cutting systems for CLC, NAAC, EPS and ceramsite wall-material production.
CLC / foam concrete, NAAC, EPS self-insulating and ceramsite products are process and product options within the block family.
02Panel systems are configured around geometry, reinforcement, moulds, curing and the required finishing process.
03Horizontal and vertical cutting, slotting, stacking and transfer systems can be integrated into an existing factory.
Our Foshan team fabricates machine frames, assembles cutting and handling equipment, and checks controls and alignment before shipment.

Frames and connected equipment are prepared for the specified production process.

Cutting, transfer and handling equipment are assembled and aligned in the manufacturing workshop.

Technicians check the controls and equipment operation as part of factory preparation.
HENGDE develops the process around your local raw materials. Our engineers use material assessment and trial batches to establish the formulation, dosing, mixing sequence and curing plan. The results guide equipment selection and give your production team a clear starting point for operation.
Batching, mixing, mould circulation, cutting and handling can be configured around the project’s factory space and automation requirements. Review process flow, machine interfaces, utilities and future expansion before finalizing the line.
The National Digital Standards Library lists Guangzhou Hengde Construction Technology Co., Ltd. (广州恒德建筑科技有限公司) among the drafting organizations of the current Chinese building-material industry standard JC/T 1062-2022, Foamed Concrete Blocks. Drafting participation is evidence of standards work; product conformity and project performance still require the applicable test and acceptance records.
Prepare foundations, utilities and the installation sequence before equipment arrival. Commissioning, operator training, maintenance guidance and spare-parts support are defined with the project scope.
Explore HENGDE installations, line upgrades and equipment deliveries, with photographs from the actual projects.
Tell us your project country and intended product, or arrange a visit to the manufacturing base.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.