LIGHTWEIGHT BLOCK PRODUCTION LINES

Lightweight Block Production Line

Compare CLC, NAAC, EPS and ceramsite lightweight block production routes, then select the capacity, raw-material preparation, moulding, curing, cutting, handling and automation required by the real project.

Delivery lead time: 40–50 working days.

Real HENGDE lightweight block cutting line inside a production workshop
Real HENGDE lightweight block cutting line inside a production workshop

Choose the block and process route before comparing machines

01
QUICK ANSWER

A lightweight block production line is a connected factory system, not one universal machine list. CLC uses physical foam, NAAC uses chemical aeration, EPS requires controlled lightweight-particle dosing, and ceramsite requires aggregate-specific preparation. Capacity and automation are calculated after the product and local materials are confirmed.

Block construction

From finished blocks to site use

Construction references can help define the block format and handling requirements for a new manufacturing project.

Application reference

Block laying on site

The clip shows bedding material being spread and a block being positioned in a wall. Specify the block dimensions and joint system as part of your product plan.

Silent video · 6 seconds

Application reference

On-site block sizing

The clip shows a block being cut to fit on site. Discuss the required block sizes, product consistency and finishing needs when planning the production line.

Silent video · 5.9 seconds

The clips illustrate site activities. Material performance and installation details must be specified for the actual product and wall system.

Information HENGDE needs before preparing a line proposal

05
PROJECT INFORMATION
01

Project country and market

Product standards, saleable sizes, climate and expected demand.

02

Target product

CLC, NAAC, EPS, ceramsite or another confirmed lightweight block.

03

Planned daily output

Saleable output, shifts and future expansion—not only nominal machine capacity.

04

Available raw materials

Sources, test data, photos and representative samples where possible.

05

Factory conditions

Land, workshop, power, water, roads, lifting and storage.

06

Automation and delivery scope

Labour, maintenance capability, installation, training and commissioning needs.

Questions to answer before equipment selection

BUYER QUESTIONS
Which lightweight block production route should I choose?+

Choose from the required block, local materials, process capability, curing route, market requirements and project budget. CLC, NAAC, EPS and ceramsite are not interchangeable machine lists.

What capacities does HENGDE provide?+

Published block-line planning directions include 30, 50, 100, 200 and 300 m³/day. The final output basis and equipment are recalculated for the project.

Can one line make several types of lightweight blocks?+

Some equipment can be shared, but material preparation, aeration or lightweight-aggregate handling, moulds, curing and process controls may differ. Compatibility must be reviewed before the line is confirmed.

Can HENGDE assess local raw materials?+

Yes. HENGDE can review material information and samples before recommending the process and equipment direction.

Does HENGDE support installation and training?+

Installation, commissioning and operator training can be included according to the agreed project scope and site readiness.

Planning a New Production Line?

DISCUSS YOUR PROJECT

Send the project country, target product, planned output and available raw materials for an engineering review.

Get a Production Line Proposal

Mixing equipment: a workshop view

The enclosed horizontal mixing unit shown here is one equipment example from HENGDE company materials. To select the mixing arrangement, provide your raw materials, intended product and required output. The photograph does not identify a model or establish its capacity or installed power.

Discuss your raw materials and mixing configuration

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.