Factory exterior
The HENGDE building and workshop exterior.
HENGDE manufactures and assembles lightweight block, wall-panel and cutting equipment at our Foshan base. See the workshop, machine assembly and factory checks behind your production line.
Delivery lead time: 40–50 working days.

Arrange a factory visit to review the team, equipment and project requirements.

The HENGDE building and workshop exterior.

A real view of equipment preparation inside the HENGDE workshop.
Actual workshop views of frame preparation and cutting-equipment assembly.

Frames and connected equipment are prepared for the specified production process.

Cutting, transfer and handling equipment are assembled and aligned in the manufacturing workshop.

Technicians assemble and check the connected cutting and transfer equipment.
Electrical controls and machine operation are checked as part of factory preparation. Project acceptance scope and witness arrangements are agreed with the customer.

Technicians check the controls and equipment operation as part of factory preparation.
Packing, loading and installation support follow the agreed equipment and delivery scope.
Equipment loading for the Indonesia customer project.
Positioning and connecting equipment at a real project site.
Contact HENGDE to arrange a visit and confirm which equipment and production demonstrations will be available.
Tell us your project country and intended product, or arrange a visit to the manufacturing base.
Inspect the chamber, drive and discharge arrangement when discussing mixing equipment. For mould handling, review the mould dimensions, pallet and transfer sequence. These company photographs show two details to discuss with the HENGDE team; a selected line still needs its own configuration and layout.


Review feeding and mixing equipment · Review demoulding options
The image below shows the chain deck, scissor-lift structure and rail base of an unloaded transfer unit. When planning the connection between stations, confirm the required transfer height, the supported mould or pallet and its load, and the transfer direction and clearances. HENGDE reviews these interfaces against the selected equipment and factory layout; no load rating or cycle time is established by this still image.

Review production-line equipment · Discuss transfer equipment and the factory layout
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.