
Handling & stacking
Demoulding crane
Separates and lifts the mould or green product at the confirmed demoulding condition.
HDKHG-001 · HDKDR-001View device and line configurations →Separate mould frames from cured green billets with controlled lifting and repeatable positioning.

Separates and lifts the mould or green product at the confirmed demoulding condition.
HDKHG-001 · HDKDR-001View device and line configurations →
Separates the mould assembly and moves the green product according to the approved demoulding sequence.
HDTH-003 · HDTH-001View device and line configurations →
Positions and removes the rod system for the confirmed reinforced wall-panel route.
HDTH-004View device and line configurations →