Foundation and installation-line check
We check equipment locations, levels and foundation interfaces against the installation drawings.
HENGDE guides equipment positioning, alignment and connection at your factory, bringing the individual machines together in the designed production sequence.
Delivery lead time: 40–50 working days.

We check equipment locations, levels and foundation interfaces against the installation drawings.
We guide positioning and alignment so moulds, carriers and products move between connected stations.
We coordinate mechanical, electrical and utility connections with the responsible site teams.
We check the installed arrangement and identify the work needed before commissioning.
Machines positioned and connected in the designed process sequence.
Alignment, interfaces and connection checks recorded for the installed equipment.
A clear list of items to close before production trials.
The installed line prepared for controlled machine checks and operator instruction.
Tell us what you plan to produce and where the factory will be built.
HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.
HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.
For recycled or variable inputs, representative samples and production trials establish how that specific source performs.
We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.
The equipment proposal then follows the tested process and the required product, rather than a generic machine list.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.