Equipment review
The site file records project-specific equipment and customer-side production context.
The Bishkek project record includes equipment, cutting and finished-block media and identifies a 100–200 m³/day planning range. The Bishkek factory photographs show the connected cutting equipment, moulds and finished blocks.
The site file records project-specific equipment and customer-side production context.
The shown cutting equipment is shown inside the Bishkek production area.
The case file includes finished-block media from the same project.