PROJECT CASE

Lanzhou 300 m³/day self-insulating block line shipment

HENGDE completed manufacturing and factory testing before dispatch of the Lanzhou homogeneous composite self-insulating block line in March 2026. The project uses a CLC physical-foaming route, with pre-delivery photographs of the equipment, cutting system and test product.

Independent engineeringEquipment manufacturingProject delivery
REAL PRE-DELIVERY FACTORY MEDIAfactory-test media before the shown Lanzhou dispatch
Cut self-insulating block at the equipment output during the Lanzhou factory test
HENGDEProject-specific configuration
01
PRE-DELIVERY STAGE

Equipment preparation, cutting and factory testing

Production equipment prepared before delivery for the Lanzhou project REAL PRE-DELIVERY PHOTO
01

Equipment preparation

HENGDE prepared the production equipment for delivery to the customer factory.

Cutting system during the pre-delivery factory record for the Lanzhou project REAL FACTORY-TEST PHOTO
02

Cutting system

A separate factory image documents the cutting system during the pre-delivery record.

Cut self-insulating block at the equipment output during the Lanzhou factory test REAL PRODUCT-TEST PHOTO
03

Cut block at output

The factory-test record includes a cut self-insulating block at the equipment output.

02
MANUFACTURING, TESTING & DISPATCH

Factory-tested equipment prepared for the customer site

This project record covers manufacturing, factory testing and dispatch. The next delivery stages are site installation, commissioning and operator training, coordinated with the customer's foundations, utilities and receiving arrangements.