Tacheng 100 m³/day self-insulating block cutting upgrade

HENGDE upgraded the Tacheng customer’s older vertical cutting process. The project covers equipment delivery and product measurement, with finished self-insulating blocks shown at the customer’s existing factory.

Independent engineeringEquipment manufacturingProject delivery
REAL TACHENG PROJECT MEDIAequipment and product media from the Tacheng cutting-system upgrade
Cut self-insulating block being measured during the Tacheng upgrade record
HENGDEProject-specific configuration
01
CUTTING UPGRADE

Shipment, measurement and finished-product records

Cutting-upgrade equipment being loaded for the Tacheng project REAL LOADING PHOTO
01

Equipment loading

The supplied file includes the cutting-upgrade equipment being loaded for delivery.

Cut self-insulating block being measured during the Tacheng upgrade record REAL PRODUCT-CHECK PHOTO
02

Product measurement

A site image documents a cut self-insulating block being measured during the upgrade record.

Finished self-insulating blocks after the Tacheng cutting-system upgrade REAL FINISHED-PRODUCT PHOTO
03

Finished blocks

Finished self-insulating blocks are shown after cutting at the customer factory.

02
PERFORMANCE BOUNDARY

Cutting results depend on the actual product and line

Product density, moisture, dimensions, upstream handling and operating settings must be reviewed before any accuracy or throughput commitment.