Location
Malaysia
This Malaysia lightweight block project is documented from local-material testing and factory planning through agreement and equipment shipment on August 25–26, 2026.
HENGDE developed the Malaysia project from local-material trials and factory planning through the equipment agreement and August 2026 shipment. The team connected the customer’s material samples with the process, equipment and factory plan before manufacturing and delivery.
Malaysia
Lightweight blocks using the customer’s reviewed local material route
Equipment shipment completed on August 25–26, 2026
The customer supplied local samples and reviewed formula, process, equipment and factory conditions with HENGDE before selection.
The parties signed the lightweight block project after practical factory and material review.
HENGDE completed the documented equipment manufacturing and shipment preparation for the confirmed project configuration.
The production-line equipment and supporting components were loaded and shipped to the customer’s Malaysia project site.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL SIGNING MEDIA Real HENGDE media from the documented January 2026 project signing.
REAL SHIPMENT MEDIA Real HENGDE media from the documented August 2026 equipment shipment.
The project covers a complete lightweight block production direction.
The equipment plan follows the local-material and factory review.
Raw material named in the published project source.
Tell us what you plan to produce and where the factory will be built.