Beyond Machines. Complete Factory Solutions.

From Factory Planning to Production — One Partner for Your Entire Project.

HENGDE is a Turnkey Lightweight Block & Wall Panel Factory Solutions Provider. We plan for your local materials, stable foaming and precise cutting, then support installation and operator training.

Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.

2014Established
20+Export markets
Explore 200 m³/day · design basis →
01 / 03

What are you planning?

Choose the project you are planning. The engineering comparison below also covers supplying blocks or panels for a construction project.

Compare all three project types and what to prepare
Your projectWhat to bring to the discussionWhat we work through
A new factoryThe block or panel you plan to sell, your output target, available raw materials and the proposed site.The production process, equipment configuration and material flow through the factory. Plan a new factory.
An existing-line upgradePhotos or drawings of the current equipment, the production bottleneck and the product you need to make.Which process stage needs changing and how new equipment connects to the existing line. Discuss a line upgrade.
Production for a construction projectThe required block or panel specification, the planned material demand and the available production site.The product requirements, production arrangement and the equipment scope to assess. Discuss project supply.

Stable foaming and precision cutting

HENGDE 8th Generation Intelligent Cutting System

  • ±1mm Cutting Accuracy Keep block dimensions consistent.
  • 1.7–2mm Blade Kerf Limit material lost in each cut.
  • Size Changeover Within 1 Minute Reduce downtime between product sizes.

HENGDE specifies these figures for the applicable eighth-generation cutting configuration. See cutting specifications and factory solutions.

PRODUCTION LINES & EQUIPMENT

Start with the product
you want to manufacture.

All production lines

Building applications

How blocks and panels are used on site

Explore construction applications, then define the wall product, material system and production capacity for your factory. HENGDE supplies production-line engineering and equipment for block and wall-panel manufacturers.

These scenes illustrate construction applications. Suitability for a specific building depends on the selected material, tested wall system and project design.

FROM MATERIAL TO FINISHED BLOCK

Follow the production.

Six connected stages. Scroll to see the equipment behind each step, or select a stage.

CLC mixing equipment at the HENGDE Albania project
CLC mixing equipment at the HENGDE Albania project
01 / 06

Process examples from HENGDE equipment and project records. Photographs do not all show one factory or one configuration.

01 / PRODUCTION

Mixing

Metered solids, water and preformed foam enter the selected mixer.

CLC mixing equipment at the HENGDE Albania project
02 / PRODUCTION

Pouring

The mixed material is discharged into the mould circulation line.

Mixed material discharged from the mixer outlet into a mould during a HENGDE material trial
03 / PRODUCTION

Curing

Mould circulation and curing are matched to the product and site conditions.

Curing moulds at the Guyuan 200 cubic metre project
04 / PRODUCTION

Demoulding

Release and transfer the green body at the required handling condition.

HENGDE lightweight block demoulding and transfer process
05 / PRODUCTION

Cutting

The cutting sequence follows the product dimensions and green-body condition.

CLC block cutting equipment at the HENGDE Albania project
06 / PRODUCTION

Stacking

Transfer and stack the cut products for the next handling stage.

Stacking clamp beside finished lightweight blocks in a HENGDE factory
Watch the production process

A MANUFACTURER YOU CAN VISIT

Established
2014
Equipment R&D and manufacturing
Export markets
20+
International project experience
Cutting batch size
Project-specific
Confirm the cutter model and green-body dimensions with our engineering team.
Working days
40–50
Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.

REAL MACHINES. REAL PROCESS.

Watch HENGDE equipment
at work.

All factory & project videos
INSIDE THE PROCESS

Lightweight block cutting station in operation

Watch the cutting station work through a lightweight concrete casting in this silent workshop close-up.

Open the player, then use its play and pause controls. No automatic playback.

Open video ↗

From factory planning to after-sales support

  1. Factory PlanningSet the product, saleable output, site layout and utilities.
  2. Raw Material TestingIdentify and trial the locally available materials.
  3. Formula DevelopmentAdjust the mix and check the product after moulding and curing.
  4. Equipment Selection & ManufacturingMatch station timings and interfaces before assembly and factory checks.
  5. Installation & CommissioningPlan delivery and lifting, connect equipment and run the line with local materials.
  6. Training & After-salesTrain the operators and agree how to report faults and identify spares.

South Africa: EPS block project · EPS equipment route
Indonesia: dual-channel cutting line · Cutting configurations
Uzbekistan: site installation · 200 m³/day reference configuration

Explore overseas projects by country and delivery stage · Talk to Our Engineering Team

PREPARE YOUR FACTORY PROPOSAL

The details behind
the configuration.

Product, raw materials, site and equipment scope — keep the engineering detail available without losing the production story.

01

Find the production route for your product

Lightweight blocks
Compare the CLC production route and the NAAC production route against your intended product and raw materials. For a specific design-capacity discussion, view the 200 m³/day line.
Lightweight wall panels
Plan around the finished panel, mould arrangement, curing, demoulding and handling. View wall-panel production lines.
Cutting systems
Discuss the billet and finished-product sizes, cutting stage and interfaces with upstream and downstream equipment. View cutting systems.
02

Bring your raw materials and factory into the plan

The equipment list starts with the product and the materials you can obtain. Share each material’s source, available photographs and test reports. If samples are sent, identify the source, batch and sampling date so the material being assessed can be traced.

For the factory, send the building dimensions and clear height, column positions, entrances, storage and curing areas, and the available power and water information. These inputs help us discuss equipment placement and the movement of materials and products.

Submit your raw-material information · Discuss the factory layout

03

See where HENGDE builds the equipment

Guangzhou Hengde Construction Technology Co., Ltd. manufactures lightweight block lines, wall-panel lines and cutting equipment. Our Foshan workshop brings the equipment and its production-line interfaces into the same engineering discussion.

HENGDE manufacturing workshop — real factory photograph.
HENGDE manufacturing workshop — real factory photograph.

View the factory and equipment

04

HENGDE equipment in customer projects

Explore connected equipment at the Xianning factory and the loading record for the Ghana wall-panel shipment.

Connected HENGDE equipment at the Xianning customer site — real project photograph.
Connected HENGDE equipment at the Xianning customer site — real project photograph.
Xianning, China — production started February 2025
Project record: combined block and wall-panel production, with connected cutting and handling equipment. View the Xianning project record.
Ghana — wall-panel equipment shipped July 2026
Loading and shipment of wall-panel equipment. View the Ghana shipment record.
05

Get an equipment configuration and factory proposal

Tell us the project country, target product and current stage. Add an output target, raw-material information or a site drawing when available. We will use these inputs to discuss the equipment configuration, factory layout and formal quotation.

The quotation needs a clear supply boundary: included equipment, options and items prepared by the customer. Delivery, shipment, installation, commissioning and training are separate parts of the project discussion.

Get a Factory Proposal

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.