SMALL & MEDIUM FACTORIES FIRST

Lightweight Block & Wall Panel Production Lines

Start with the small and medium configurations most suitable for staged investment, then compare higher-output project references when the market, materials and factory plan support them.

Delivery lead time: 40–50 working days.

Connected HENGDE lightweight block production equipment at the Cote d Ivoire customer project
Connected HENGDE lightweight block production equipment at the Cote d Ivoire customer project

Compare published equipment configurations by capacity

Start with the output your market needs. Compare the line layouts and equipment lists, from compact factories to higher-output configurations.

SMALL / MEDIUM PRIORITY · BLOCK · 30 m³/day

30 m³/day CLC Block Production Line

HENGDE 30 cubic metre per day compact lightweight block production line engineering layoutENGINEERING LAYOUT

3.75 m³/hour planning reference · 8 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 50 m³/day

50 m³/day CLC Block Production Line

50 cubic metre square-mould physical-foaming lightweight block line engineering layoutENGINEERING LAYOUT

6.25 m³/hour planning reference · 15 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 80 m³/day

80 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopWORKSHOP EQUIPMENT PHOTO

10 m³/hour planning reference · 31 equipment rows · Simplified configuration

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 100 m³/day

100 m³/day CLC Block Production Line

100 cubic metre per day lightweight block production line engineering layoutENGINEERING LAYOUT

12.5 m³/hour planning reference · 24 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 150 m³/day

150 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopWORKSHOP EQUIPMENT PHOTO

18.75 m³/hour planning reference · 29 equipment rows · Standard configuration

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · BLOCK · 200 m³/day

200 m³/day CLC Block Production Line

Engineering layout of the 200 m³/day lightweight block lineENGINEERING LAYOUT

25 m³/hour planning reference · 25 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
SMALL / MEDIUM PRIORITY · WALL PANEL · 200 m³/day

200 m³/day Lightweight Wall Panel Production Line

HENGDE lightweight wall panel production equipment assembled in the workshopWORKSHOP EQUIPMENT PHOTO

25 m³/hour planning reference · 30 equipment rows · Standard configuration

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 300 m³/day

300 m³/day CLC Block Production Line

300 cubic metre per day CLC block production line engineering layoutENGINEERING LAYOUT

37.5 m³/hour planning reference · 25 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 400 m³/day

400 m³/day CLC Block Production Line

400 cubic metre per day lightweight block production line engineering layoutENGINEERING LAYOUT

50 m³/hour planning reference · 26 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · WALL PANEL · 500 m³/day

500 m³/day Lightweight Wall Panel Production Line

HENGDE 500 cubic metre wall-panel production line engineering layoutENGINEERING LAYOUT

62.5 m³/hour planning reference · 32 equipment rows · Chemical-reaction mixing configuration

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 600 m³/day

600 m³/day CLC Block Production Line

HENGDE lightweight block production equipment assembly shown for the 600 cubic metre line scopeEQUIPMENT ASSEMBLY PHOTO

75 m³/hour planning reference · 27 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →
HIGHER-OUTPUT REFERENCE · BLOCK · 1000 m³/day

1000 m³/day CLC Block Production Line

HENGDE lightweight block production equipment assembly shown for the 1000 cubic metre line scopeEQUIPMENT ASSEMBLY PHOTO

125 m³/hour planning reference · 31 equipment rows · Physical foaming · Non-autoclaved

Open layout and equipment table →

From local materials to an operating factory

HENGDE connects raw-material testing, factory planning, equipment manufacturing and site commissioning in one delivery plan. Our engineers develop the production route and machine interfaces, and our team prepares operators for production and maintenance. The proposal identifies the equipment, site preparation and services for your factory.

  1. 01

    Raw Material Testing

    Evaluate representative samples from the project location before selecting the final process.

  2. 02

    Formula Adjustment

    Adjust the formulation and material ratios against the test results and target product.

  3. 03

    Product & Process Selection

    Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.

  4. 04

    Factory Layout Planning

    Coordinate land, buildings, storage, material flow, foundations and utilities.

  5. 05

    Production Line Customization

    Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.

  6. 06

    Equipment Manufacturing

    Prepare the agreed machines, tooling and controls against the approved configuration.

  7. 07

    Factory Acceptance

    Check applicable equipment and delivery scope before shipment.

  8. 08

    Packing & Shipping

    Coordinate packing, loading and destination requirements with the project shipping plan.

  9. 09

    Site Installation

    Install and connect the agreed equipment after site conditions are ready.

  10. 10

    Commissioning

    Check machine sequences and trial production with the selected materials.

  11. 11

    Operator Training

    Train operators in safe use, production sequence and routine maintenance.

  12. 12

    After-sales & Spare Parts

    Plan maintenance communication and spare-parts support for the installed equipment.

Build the production process around your local materials

RAW MATERIAL ENGINEERING

HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.

Understand your local materials

HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.

For recycled or variable inputs, representative samples and production trials establish how that specific source performs.

Turn trial results into a production method

We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.

The equipment proposal then follows the tested process and the required product, rather than a generic machine list.

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration