
Hami Block Factory Prepares for Equipment Retrofit
A September 2024 update describes planning for a block-equipment retrofit at a stopped factory in Hami, Xinjiang.
Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

A September 2024 update describes planning for a block-equipment retrofit at a stopped factory in Hami, Xinjiang.

HENGDE’s September 2024 Aksu update records equipment delivery and installation work at the customer’s site.

HENGDE’s September 2024 archive records equipment conversion and commissioning work at a Zhejiang wall-material factory.

A September 2024 HENGDE update records equipment installation for a foam concrete block line in Inner Mongolia.

HENGDE’s September 2024 archive reports that reinforced partition panel equipment for a Henan customer had entered production.

HENGDE’s archive records the start of installation work for an EPS-particle block line in Kyrgyzstan on 25 September 2024.

A foam concrete mixer should combine the slurry and foam consistently while supporting the density and workability required by the product.

A vertical cutting system needs a clear specification of the lightweight wall material, product dimensions and handling sequence.

Consistent block dimensions require coordination between the mix, moulding, curing, cutting and finished-product checks.

Online cutting depends on bringing a lightweight concrete body to the saw in a condition that supports stable dimensions and handling.
Tell us what you plan to produce and where the factory will be built.