Language

NEWS & TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

39Published items
in this view
DR Congo project customer and a HENGDE representative shaking hands with signed documents on 12 October 2026.
SIGNING

DR Congo Customer Signs for a 200 m³/day Lightweight Block Production Line

After visiting HENGDE on 10 October 2026, a DR Congo real estate developer signed for a lightweight block line with a planned capacity of…

SIGNING

On September 10, 2026, the Ethiopian client and Guangzhou Hengde Construction Technology Co., Ltd. officially signed a contract.

On 10 September 2026, an Ethiopian client signed a gypsum block production-equipment contract with Guangzhou Hengde Construction Technology Co., Ltd. The agreed project centres…

HENGDE Timor-Leste lightweight block project signing and factory review
SIGNING

HENGDE Signs Timor-Leste Lightweight Block Production Line Project After Two-Day Factory Review

On August 1, 2026, the Timor-Leste project team signed a lightweight block production-line agreement with HENGDE after completing a two-day factory review. The decision…

HENGDE Indonesia lightweight block project signing and factory review
SIGNING

HENGDE Signs 200 m³/day Lightweight Block Production Line Project in Indonesia

HENGDE signed a lightweight block production-line project with an Indonesia-based customer on July 26, 2026. The customer comes from a real-estate background and plans…

HENGDE Albania lightweight block project signing and factory review
SIGNING

Albania Project Team Signs HENGDE Lightweight Block Production Line After Factory Review

An Albania project team visited HENGDE on April 24, 2026 to review lightweight block production equipment and signed a project agreement during the visit.…

HENGDE China self-insulating block project signing and factory review
SIGNING

HENGDE Signs Aksu Self-Insulating Block Production Line Upgrade

On May 8, 2026, HENGDE signed an upgrade project with a customer in Aksu, Xinjiang for an existing self-insulating block production line. The customer's…

HENGDE Ghana lightweight wall panel project signing and factory review
SIGNING

HENGDE Signs Ghana Lightweight Wall-Panel Production Line Project

HENGDE signed a lightweight wall-panel production-line project with a Ghana customer on April 28, 2026. The project is intended to establish local wall-panel production…

HENGDE Indonesia clc / foamed concrete block project signing and factory review
SIGNING

HENGDE Signs Indonesia Foamed-Concrete Block Production Project

HENGDE signed a foamed-concrete block production project with an Indonesia customer on April 20, 2026. The customer plans to establish local block production in…

HENGDE Guyana cutting system project signing and factory review
SIGNING

HENGDE Signs Guyana Production-Line Upgrade from Mould-Only Forming to Precision Cutting

HENGDE signed a production-line upgrade project with a Guyana customer on April 20, 2026. The customer's existing plant primarily relies on mould-only forming, and…

Wuwei Customer Signs a Cutting-System Retrofit for Self-Insulating Blocks — original project photo 1
SIGNING

Wuwei Customer Signs a Cutting-System Retrofit for Self-Insulating Blocks

HENGDE signed a cooperation agreement on 21 January 2026 to upgrade the cutting system of an existing self-insulating block line in Wuwei, Gansu.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page