Language

NEWS & TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

14Published items
in this view
People guiding equipment movement at the HENGDE lightweight block project site in Indonesia.
INSTALLATION

By Air, Road and Boat: HENGDE Installation Support in Indonesia

An engineer's journey from China to an Indonesian lightweight block project continues with site checks and equipment positioning after shipment.

HENGDE Engineers Begin Installation Preparation at an African Customer Site — original project photo 1
INSTALLATION

HENGDE Engineers Begin Installation Preparation at an African Customer Site

An August 2026 project update records equipment arrival and on-site installation preparation at an African customer’s factory, with HENGDE engineers providing guidance.

HENGDE engineer supporting lightweight block production-line installation in Uzbekistan
INSTALLATION

Uzbekistan Lightweight Block Production Line Enters On-Site Installation Stage

HENGDE's service team is supporting on-site installation of a lightweight block production line in Uzbekistan. The customer site is progressing through foundations, rail work,…

HENGDE engineer supporting self-insulating block production-line installation in China
INSTALLATION

Aksu Self-Insulating Block Line Upgrade Enters On-Site Installation Stage

The Aksu self-insulating block line upgrade has entered the on-site installation stage, with HENGDE's service team working at the customer's existing factory. The retrofit…

HENGDE engineer supporting lightweight wall panel production-line installation in Ghana
INSTALLATION

HENGDE Engineer Arrives in Ghana to Prepare Block and Wall-Panel Line Installation

A HENGDE after-sales engineer has arrived at the Ghana project site to prepare installation of the customer's lightweight block and wall-panel production equipment. The…

HENGDE engineer supporting lightweight block production-line installation in Côte d’Ivoire
INSTALLATION

HENGDE After-Sales Engineer Arrives in Côte d’Ivoire for Lightweight Block Line Installation

HENGDE's after-sales engineer has arrived at the Côte d’Ivoire project site to support installation of a lightweight block production line. With the equipment delivered…

Zhejiang Ceramsite Wall-Material Retrofit Reaches Batch Production — archive image 1
INSTALLATION

Zhejiang Ceramsite Wall-Material Retrofit Reaches Batch Production

An October 2024 archive update reports batch production after upgrading an existing Zhejiang wall-material line.

Ningbo AAC Factory Reports Production After Ceramsite Block Retrofit — archive image 1
INSTALLATION

Ningbo AAC Factory Reports Production After Ceramsite Block Retrofit

An October 2024 HENGDE update reports that a Ningbo factory had completed a conversion towards ceramsite block production and started operating.

Hami Block Factory Prepares for Equipment Retrofit — archive image 1
INSTALLATION

Hami Block Factory Prepares for Equipment Retrofit

A September 2024 update describes planning for a block-equipment retrofit at a stopped factory in Hami, Xinjiang.

Aksu Wall-Material Equipment Installation Progresses in September 2024 — archive image 1
INSTALLATION

Aksu Wall-Material Equipment Installation Progresses in September 2024

HENGDE’s September 2024 Aksu update records equipment delivery and installation work at the customer’s site.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page