TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Engineering guidance on raw materials, process selection, production capacity, cutting systems and factory operation.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

83Published items
in this view
Forklift handling equipment for the second Albania customer shipment
TECHNICAL GUIDES

A Spare-Parts and Remote-Support Handover Checklist for Overseas Block Lines

An overseas block factory needs a handover pack the local team can use during an actual stoppage. HENGDE organizes the supplied machine identifiers, current…

HENGDE equipment at the Yuyao project factory
TECHNICAL GUIDES

What to Verify Before Reusing Cutting Water and Fine Material

Cutting-water recovery works best when the factory measures what it returns to the mixer. The recovered stream contains water and fine solids, so adding…

Equipment handling in the HENGDE workshop for the second Albania customer
TECHNICAL GUIDES

Who Makes and Supports Each Part of Your Block Production Line?

HENGDE combines block-production engineering, equipment manufacturing and project support into one line proposal. For a buyer, that means knowing who supplies each machine, who…

Cut ceramsite blocks showing aggregate texture beside HENGDE cutting equipment in Shaoxing
TECHNICAL GUIDES

A Product Brief for Customers Entering Lightweight Block Manufacturing

Your first equipment inquiry should describe the block you intend to sell. HENGDE uses that product brief to select the process, moulds, cutting arrangement…

HENGDE workshop technician working on an equipment frame
TECHNICAL GUIDES

How to Test a Block Cutting-Line Product Changeover

A block-size change affects the cutter, product inspection and the equipment that handles the finished blocks. HENGDE plans the trial around that complete transition,…

Cutting and handling equipment inside the Yuyao workshop
TECHNICAL GUIDES

Why Non-Autoclaved Blocks Still Need a Curing-Space Plan

A non-autoclaved block factory needs a working curing and storage plan before the equipment is installed. HENGDE plans the positions for filled moulds, demoulded…

Ethiopia project visitors reviewing equipment in the HENGDE workshop
TECHNICAL GUIDES

Factory Acceptance and Site Acceptance for a Lightweight Block Line

A complete block line needs a clear equipment scope, an installation plan and a practical way to judge the finished system. Factory acceptance checks…

Cutting equipment during the Philippines customer site visit
TECHNICAL GUIDES

What to Record When a New Block Line Develops Repeated Faults

Repeated stops on a new block line need a structured diagnosis, not repeated resets. Identify whether the event is a safety or control stop,…

Equipment control system check in the HENGDE workshop
TECHNICAL GUIDES

Installed Power and Electricity Use in a Block Factory: What Is the Difference?

Installed power tells you which equipment loads belong in the electrical design. Metered electricity tells you what a factory consumed. These are different figures:…

Stacks of finished blocks at the Yuyao customer site
TECHNICAL GUIDES

How to Check Block Dimensions During Cutting-Line Acceptance

Cutting-line acceptance should answer two questions: do the blocks match the agreed product drawing, and can the complete line repeat that result through cutting…

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project