NEWS & TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

314Published items
in this view
Converting an AAC or ALC Factory to Ceramsite Wall Materials — archive image 1
TECHNICAL GUIDES

Ceramsite Wall Panel Cutting: Connect Forming, Demoulding and Finishing

Ceramsite wall-panel equipment needs a coherent route from material preparation and mould filling through to cutting and handling.

GB/T 23450-2024: Plan Partition Panel Testing with the Product Specification — archive image 1
TECHNICAL GUIDES

GB/T 23450-2024: Plan Partition Panel Testing with the Product Specification

GB/T 23450-2024, Heat preservation panels for partition wall used in buildings, was published on 26 October 2024 with an implementation date of 1 May…

Comparing Foam Concrete Block Equipment Quotes: Define the Factory Scope — archive image 1
TECHNICAL GUIDES

Planning a Lightweight Block Factory Around Local Materials

Local material supply is an important input to a lightweight block factory proposal. The formulation and equipment need to be developed together.

Thailand Customers Examine Foam Concrete Block Equipment and Factory Layout — archive image 1
CUSTOMER VISITS

Thailand Customers Examine Foam Concrete Block Equipment and Factory Layout

Thai customers inspected HENGDE in October 2024 while preparing a possible foam concrete block factory project.

Tajikistan Customers Review a Complete Foam Concrete Factory Proposal — archive image 1
CUSTOMER VISITS

Tajikistan Customers Review a Complete Foam Concrete Factory Proposal

Tajikistan customers visited HENGDE in October 2024 to examine foam concrete equipment and factory-planning services.

Cement Foam Partition Panels: Materials and Production Planning — source image 2
TECHNICAL GUIDES

Lightweight Partition Panel Equipment: A Product-First Selection Guide

A lightweight partition panel line should be specified around the panel system, material route, dimensions and finishing requirements.

Horizontal Wall Panel Production Lines: Six Functions to Coordinate — archive image 1
TECHNICAL GUIDES

Horizontal Wall Panel Production Lines: Six Functions to Coordinate

HENGDE’s October 2024 overview describes a horizontal wall-panel route linking material preparation, filling, mould movement, transfer, curing and stacking.

Permanent Insulation Formwork Equipment: Define the Panel System First — archive image 1
TECHNICAL GUIDES

Permanent Insulation Formwork Equipment: Define the Panel System First

A permanent insulation formwork equipment proposal should begin with the panel system, material construction and intended building application.

Guangdong Investor Reviews a Foam Concrete Block Factory Plan for Kenya — archive image 1
CUSTOMER VISITS

Guangdong Investor Reviews a Foam Concrete Block Factory Plan for Kenya

A Guangdong customer visited HENGDE in October 2024 while considering a foam concrete block factory in Kenya.

Ningbo AAC Factory Reports Production After Ceramsite Block Retrofit — archive image 1
INSTALLATION

Ningbo AAC Factory Reports Production After Ceramsite Block Retrofit

An October 2024 HENGDE update reports that a Ningbo factory had completed a conversion towards ceramsite block production and started operating.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project
WhatsAppDiscuss this page