TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Engineering guidance on raw materials, process selection, production capacity, cutting systems and factory operation.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

83Published items
in this view
Ceramsite Block Production Equipment: Match Aggregate, Moulds and Cutting — archive image 1
TECHNICAL GUIDES

Ceramsite Block Production Equipment: Match Aggregate, Moulds and Cutting

Ceramsite block production combines a lightweight aggregate formulation with equipment for mixing, moulding, curing and finishing.

China’s 2024 Wall-Material Policy Archive: Questions for Factory Planning — archive image 1
TECHNICAL GUIDES

China’s 2024 Wall-Material Policy Archive: Questions for Factory Planning

China’s 2024 policy discussions linked resource reuse, building energy efficiency and wall-material quality. Factory planning still requires a defined product and local project review.

GB/T 23450-2024: Plan Partition Panel Testing with the Product Specification — archive image 1
TECHNICAL GUIDES

GB/T 23450-2024: Plan Partition Panel Testing with the Product Specification

GB/T 23450-2024, Heat preservation panels for partition wall used in buildings, was published on 26 October 2024 with an implementation date of 1 May…

Converting an AAC or ALC Factory to Ceramsite Wall Materials — archive image 1
TECHNICAL GUIDES

Ceramsite Wall Panel Cutting: Connect Forming, Demoulding and Finishing

Ceramsite wall-panel equipment needs a coherent route from material preparation and mould filling through to cutting and handling.

Comparing Foam Concrete Block Equipment Quotes: Define the Factory Scope — archive image 1
TECHNICAL GUIDES

Planning a Lightweight Block Factory Around Local Materials

Local material supply is an important input to a lightweight block factory proposal. The formulation and equipment need to be developed together.

Cement Foam Partition Panels: Materials and Production Planning — source image 2
TECHNICAL GUIDES

Lightweight Partition Panel Equipment: A Product-First Selection Guide

A lightweight partition panel line should be specified around the panel system, material route, dimensions and finishing requirements.

Horizontal Wall Panel Production Lines: Six Functions to Coordinate — archive image 1
TECHNICAL GUIDES

Horizontal Wall Panel Production Lines: Six Functions to Coordinate

HENGDE’s October 2024 overview describes a horizontal wall-panel route linking material preparation, filling, mould movement, transfer, curing and stacking.

Permanent Insulation Formwork Equipment: Define the Panel System First — archive image 1
TECHNICAL GUIDES

Permanent Insulation Formwork Equipment: Define the Panel System First

A permanent insulation formwork equipment proposal should begin with the panel system, material construction and intended building application.

Foam Concrete Mixing Equipment: Protect the Mix Through the Batch Cycle — archive image 1
TECHNICAL GUIDES

Foam Concrete Mixing Equipment: Protect the Mix Through the Batch Cycle

A foam concrete mixer should combine the slurry and foam consistently while supporting the density and workability required by the product.

Vertical Cutting Systems for Lightweight Wall Materials: Define the Configuration — archive image 1
TECHNICAL GUIDES

Vertical Cutting Systems for Lightweight Wall Materials: Define the Configuration

A vertical cutting system needs a clear specification of the lightweight wall material, product dimensions and handling sequence.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project
WhatsAppDiscuss this page