
Foamed-Concrete Block Production: From Raw Materials to Finished Blocks
A foamed-concrete block line connects raw-material preparation, batching, mixing and foaming with forming, curing, cutting and finished-product handling.
Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

A foamed-concrete block line connects raw-material preparation, batching, mixing and foaming with forming, curing, cutting and finished-product handling.

Customers from Guangxi visited HENGDE in early January 2025 for an on-site review of foam concrete block production equipment.

Three groups visited HENGDE at the beginning of January 2025, with interests spanning a Lanzhou project, Bangladesh and overseas trade.

HENGDE’s December 2024 archive reports an agreement with Russian customers following a two-day factory inspection.

HENGDE’s source report records an equipment cooperation agreement with a Malaysian customer signed on 24 December 2024.

A self-insulating block factory proposal for Gansu should connect the intended wall product with local materials, project requirements and the operating plan.

A December 2024 archive report records a Kyrgyzstan customer visit to HENGDE’s production base.

HENGDE’s December 2024 research update describes factory experiments aimed at developing lightweight concrete materials.

Customers from Neijiang, Sichuan visited HENGDE in December 2024 to review foam concrete wall-panel equipment and lightweight wall products.

HENGDE’s December 2024 archive describes engineers providing on-site assistance to a customer in Kyrgyzstan.
Tell us what you plan to produce and where the factory will be built.