NEWS & TECHNICAL GUIDES

Production Line Projects, News & Technical Guides

Project updates, factory tests, installation records and technical guidance for lightweight block and wall panel production.

Independent engineeringEquipment manufacturingProject delivery
HENGDE NEWSProject updates and technical guidance.
Hengde lightweight wall-material production equipment assembled inside the factory
HENGDEProject-specific configuration
NEWS & TECHNICAL GUIDES

Latest project updates and technical guidance

314Published items
in this view
HENGDE Equipment R&D: Pallet-Free Handling and Band-Saw Adjustment — original project photo 1
COMPANY UPDATE

HENGDE Equipment R&D: Pallet-Free Handling and Band-Saw Adjustment

HENGDE’s equipment R&D overview describes developments in block handling, packaging and band-saw adjustment for lightweight building-material production.

Sudan Project Team Reviews Lightweight Block and Wall Panel Equipment — original project photo 1
CUSTOMER VISITS

Sudan Project Team Reviews Lightweight Block and Wall Panel Equipment

A project delegation from Chongqing visited HENGDE while planning a lightweight block and wall-panel manufacturing project in Sudan.

China project team reviewing HENGDE cutting system production equipment
CUSTOMER VISITS

Sichuan Building Research Team Reviews Ultra-Thin Insulation-Board Cutting Equipment

A China project team visited HENGDE on March 5, 2026 for an on-site review of cutting-system production equipment. The visit combined engineering discussion with…

Henan Customer Reviews Decorative Moulding Equipment and Cutting — original project photo 1
CUSTOMER VISITS

Henan Customer Reviews Decorative Moulding Equipment and Cutting

A Henan customer visited HENGDE on 3 March 2026 to examine decorative moulding equipment, its production sequence and the cutting operation.

HENGDE cutting system production equipment prepared for shipment to China
SHIPMENT

HENGDE Ships Cutting-System Upgrade Equipment for Kashgar Self-Insulating Block Line

HENGDE completed a shipment of cutting-system production equipment for China on March 1, 2026, moving the project from manufacturing into the delivery stage. Before…

Planning a Small CLC Block Line in the 30–50 m³ per Day Range — original project photo 1
TECHNICAL GUIDES

Planning a Small CLC Block Line in the 30–50 m³ per Day Range

A compact CLC block line needs coordinated batching, mixing, mould turnover, cutting and curing space, even when the planned daily output is modest.

Thailand project team reviewing HENGDE lightweight block production equipment
CUSTOMER VISITS

Thailand Project Team Reviews Upgrade Options for an Existing Block Project

On February 10, 2026, a project team linked to Thailand visited HENGDE to review lightweight block production equipment and discuss how the project could…

HENGDE clc / foamed concrete block production equipment prepared for shipment to South Africa
PRODUCTION

South Africa Foamed-Concrete Block Project Enters Production Stage

A South Africa foamed-concrete block project supplied by HENGDE has moved into the production-preparation stage after completion of site construction, equipment installation and system…

Wuwei Customer Signs a Cutting-System Retrofit for Self-Insulating Blocks — original project photo 1
SIGNING

Wuwei Customer Signs a Cutting-System Retrofit for Self-Insulating Blocks

HENGDE signed a cooperation agreement on 21 January 2026 to upgrade the cutting system of an existing self-insulating block line in Wuwei, Gansu.

HENGDE project team reviewing HENGDE clc / foamed concrete block production equipment
CUSTOMER VISITS

Kazakhstan Project Team Reviews HENGDE Foamed-Concrete Block Production Project

On January 27, 2026, a customer team from Kazakhstan visited HENGDE to review CLC / foamed-concrete block production equipment and discuss how the project…

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project
WhatsAppDiscuss this page