Aksu 100 m³/day simplified self-insulating block retrofit

This Aksu customer selected a simplified 100 m³/day self-insulating-block configuration. HENGDE focused the equipment scope on the required production functions and selected automation around the customer’s initial investment plan.

Independent engineeringEquipment manufacturingProject delivery
REAL AKSU RETROFIT MEDIAA separate simplified-line record from the Aksu customer site
Mould preparation during the simplified Aksu self-insulating block retrofit
HENGDEProject-specific configuration
01
RETROFIT AT SITE

Mould preparation and the simplified circulation route

Mould-rail operation during the simplified Aksu retrofit project REAL RETROFIT-SITE PHOTO
01

Mould-rail operation

Moulds move along the retained rail route in the customer factory.

Mould preparation during the simplified Aksu self-insulating block retrofit REAL PROCESS PHOTO
02

Mould preparation

A separate image records material and mould preparation within the simplified configuration.

Mould circulation line at the simplified Aksu retrofit project site REAL LINE PHOTO
03

Mould circulation line

The customer-site media shows the mould line and existing factory rails used by the retrofit.

02
AUTOMATION SCOPE

What the simplified equipment proposal leaves out

To reduce the customer’s initial equipment investment, this simplified proposal omits automatic demoulding and automatic palletizing. Demoulding, transfer and stacking still need to be covered by the retained equipment and factory operating plan. When comparing a simplified and an automated proposal, identify who performs each task and which machines are included. HENGDE defines the retrofit scope around the existing factory and the target self-insulating block product.