Mixing
Metered solids, water and preformed foam enter the selected mixer.

HENGDE · EQUIPMENT MANUFACTURER
HENGDE connects line engineering, equipment manufacturing, delivery, installation guidance and operator training around the confirmed product, materials and factory conditions.
Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.
PRODUCTION LINES & EQUIPMENT

HENGDE manufactures complete CLC block lines with controlled physical foaming, mixing, mould circulation, cutting and handling. Our engineers connect local-material trials and your output target to the equipment and factory layout.
View line & equipment →
HENGDE engineers NAAC block lines around chemical aeration and non-autoclaved curing. We connect material formulation, dosing, mixing, mould handling and cutting, backed by equipment experience at the Ordos and Jaiyl customer projects.
View line & equipment →
HENGDE engineers and manufactures lightweight wall-panel lines from material preparation and mixing through mould circulation, curing, cutting and handling. We develop the equipment and factory layout around your panel structure and output plan.
View line & equipment →
Browse the equipment in this process stage and open any item to review its role in compatible production-line configurations.
View line & equipment →Building applications
Explore construction applications, then define the wall product, material system and production capacity for your factory. HENGDE supplies production-line engineering and equipment for block and wall-panel manufacturers.

Application reference
Start with the block dimensions, wall layout and finished-wall requirements when planning the product your factory will manufacture.
Explore block production lines →
Application reference
Review the wall position, openings, connections and finishes before defining the block specification and production process.
Plan a block production line →
Application reference
Define panel dimensions, edge profiles, handling and installation details before selecting the equipment configuration.
Explore wall panel applications →These scenes illustrate construction applications. Suitability for a specific building depends on the selected material, tested wall system and project design.
FROM MATERIAL TO FINISHED BLOCK
Six connected stages. Scroll to see the equipment behind each step, or select a stage.






Process examples from HENGDE equipment and project records. Photographs do not all show one factory or one configuration.
Metered solids, water and preformed foam enter the selected mixer.

The mixed material is discharged into the mould circulation line.

Mould circulation and curing are matched to the product and site conditions.

Release and transfer the green body at the required handling condition.

The cutting sequence follows the product dimensions and green-body condition.

Transfer and stack the cut products for the next handling stage.

A MANUFACTURER YOU CAN VISIT
REAL MACHINES. REAL PROCESS.
Watch the cutting station work through a lightweight concrete casting in this silent workshop close-up.
Open the player, then use its play and pause controls. No automatic playback.
Open video ↗CUSTOMER EQUIPMENT & DELIVERY RECORDS
Explore customer equipment and delivery records.
Project 1
Indonesia · Equipment shipped

Mongolia · Equipment installed at site

South Africa · Production-site media available

Albania · Line operating at site

Cambodia · Production-site media available

Kyrgyzstan · Production media available
Each record retains its own product, configuration and documented stage. Shipment evidence is not presented as evidence of stable production.
PREPARE YOUR FACTORY PROPOSAL
Product, raw materials, site and equipment scope — keep the engineering detail available without losing the production story.
Start with the production problem you need to solve. These are different project discussions, not different names for the same equipment package.
| Your project | What to bring to the discussion | What we work through |
|---|---|---|
| A new factory | The block or panel you plan to sell, your output target, available raw materials and the proposed site. | The production process, equipment configuration and material flow through the factory. Plan a new factory. |
| An existing-line upgrade | Photos or drawings of the current equipment, the production bottleneck and the product you need to make. | Which process stage needs changing and how new equipment connects to the existing line. Discuss a line upgrade. |
| Production for a construction project | The required block or panel specification, the planned material demand and the available production site. | The product requirements, production arrangement and the equipment scope to assess. Discuss project supply. |
The equipment list starts with the product and the materials you can obtain. Share each material’s source, available photographs and test reports. If samples are sent, identify the source, batch and sampling date so the material being assessed can be traced.
For the factory, send the building dimensions and clear height, column positions, entrances, storage and curing areas, and the available power and water information. These inputs help us discuss equipment placement and the movement of materials and products.
Submit your raw-material information · Discuss the factory layout
Guangzhou Hengde Construction Technology Co., Ltd. manufactures lightweight block lines, wall-panel lines and cutting equipment. Our Foshan workshop brings the equipment and its production-line interfaces into the same engineering discussion.

Explore connected equipment at the Xianning factory and the loading record for the Ghana wall-panel shipment.

Tell us the project country, target product and current stage. Add an output target, raw-material information or a site drawing when available. We will use these inputs to discuss the equipment configuration, factory layout and formal quotation.
The quotation needs a clear supply boundary: included equipment, options and items prepared by the customer. Delivery, shipment, installation, commissioning and training are separate parts of the project discussion.
YOUR NEXT STEP
Get the equipment configuration, factory layout and a formal quotation for your project.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.