Equipment preparation
HENGDE prepared the production equipment for delivery to the customer factory.
HENGDE completed manufacturing and factory testing before dispatch of the Lanzhou homogeneous composite self-insulating block line in March 2026. The project uses a CLC physical-foaming route, with pre-delivery photographs of the equipment, cutting system and test product.
HENGDE prepared the production equipment for delivery to the customer factory.
A separate factory image documents the cutting system during the pre-delivery record.
The factory-test record includes a cut self-insulating block at the equipment output.
This project record covers manufacturing, factory testing and dispatch. The next delivery stages are site installation, commissioning and operator training, coordinated with the customer's foundations, utilities and receiving arrangements.