Manufacturing since
Foshan manufacturing base, equipment assembly and project support.

TURNKEY LIGHTWEIGHT BLOCK & WALL PANEL LINES
From factory planning to production — one partner for your entire project.
After deposit confirmation and final factory layout approval.
Connected production line inside a customer workshop.
CHOOSE THE FACTORY YOU WANT TO BUILD

BLOCKS
Foaming, mixing, mould circulation, cutting and handling for lightweight block production.

PANELS
Long-mould forming, curing, demoulding and handling for lightweight wall panels.

CUTTING & FINISHING
360° rotary cutting under servo CNC control, with the cut face and finished dimensions checked after the trial cut.

EXISTING PLANT
Review cutting, mould circulation, transfer and handling as an upgrade when the existing factory already has usable equipment.


MATCH MATERIAL TO PRODUCT
Tell us the product, target output and local raw material. The line and cutting configuration follow the same review.
Send your product details →WHY HENGDE
Verified company facts, cutting specifications and delivery conditions — kept next to the equipment they describe.
Foshan manufacturing base, equipment assembly and project support.
International project delivery and on-site installation support.
Manufacturer specification for the applicable eighth-generation cutting configuration.
Delivery lead time after deposit confirmation and final factory layout approval.
Cutting specifications are manufacturer figures for the applicable configuration. Final scope follows the product, raw material, capacity and factory layout review.

MANUFACTURER YOU CAN VISIT
Equipment assembly, inspection and project preparation at the HENGDE manufacturing base in Foshan. Visit the workshop and review the line with the engineering team.
Factory & manufacturingEquipment assembly floor at the HENGDE manufacturing base.

PROJECT CASE · ALBANIA
The Albania factory uses HENGDE mixing, transfer and cutting equipment for a 100 m³/day project design basis. The photo shows the installed cutting line; production results depend on the confirmed operating conditions.
YOUR NEXT STEP
Send the product, target output and factory location. We will review the line, layout and equipment scope for your project.
Discuss your project
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.