Connected lightweight block production line inside a customer workshop

TURNKEY LIGHTWEIGHT BLOCK & WALL PANEL LINES

Turnkey Lightweight Block & Wall Panel Production Lines

From factory planning to production — one partner for your entire project.

Established
2014
Export markets
20+
Line capacity
30–1000 m³/day
Delivery lead time
40–50 working days

After deposit confirmation and final factory layout approval.

Connected production line inside a customer workshop.

WHY HENGDE

Equipment, engineering
and a line you can visit.

Verified company facts, cutting specifications and delivery conditions — kept next to the equipment they describe.

2014

Manufacturing since

Foshan manufacturing base, equipment assembly and project support.

20+

Export markets

International project delivery and on-site installation support.

±1 mm

Cutting accuracy

Manufacturer specification for the applicable eighth-generation cutting configuration.

40–50

Working days

Delivery lead time after deposit confirmation and final factory layout approval.

Cutting specifications are manufacturer figures for the applicable configuration. Final scope follows the product, raw material, capacity and factory layout review.

HENGDE equipment assembly floor at the Foshan manufacturing base

MANUFACTURER YOU CAN VISIT

See the line assembled
before it ships.

Equipment assembly, inspection and project preparation at the HENGDE manufacturing base in Foshan. Visit the workshop and review the line with the engineering team.

Factory & manufacturing

Equipment assembly floor at the HENGDE manufacturing base.

Installed foam-concrete block cutting line and transfer rails at the Albania customer site
Installed cutting line and connected transfer rails at the Albania customer site.

PROJECT CASE · ALBANIA

100 m³/day block line,
installed at the customer site.

The Albania factory uses HENGDE mixing, transfer and cutting equipment for a 100 m³/day project design basis. The photo shows the installed cutting line; production results depend on the confirmed operating conditions.

Product
Foam-concrete blocks
Design capacity
100 m³/day project basis
Scope
Mixing, transfer and cutting equipment
Read the Albania project

YOUR NEXT STEP

Tell us what you want to produce.

Send the product, target output and factory location. We will review the line, layout and equipment scope for your project.

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days. After deposit confirmation and final factory layout approval.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.