INSTALLATION
Hami Block Factory Prepares for Equipment Retrofit
A September 2024 update describes planning for a block-equipment retrofit at a stopped factory in Hami, Xinjiang.

What the archive records
The customer was reviewing changes because the existing equipment and product quality no longer met the factory’s needs. HENGDE’s technical work focused on a site survey and the proposed retrofit scope.

Planning the next stage
The record describes preparation, not a completed upgrade. Identify retained machinery, replacement equipment, installation work and the acceptance trial before restarting production.
Explore related HENGDE equipment and project options, or send your product and factory requirements.
Prepare commissioning and operator training
Confirm utilities, safety checks, trial-production materials and the operators who will receive equipment training.
Discuss Your Project

