Converting an AAC or ALC Factory to Ceramsite Wall Materials
An AAC or ALC factory conversion to ceramsite blocks or panels starts with a survey of the existing plant and a defined new product.

Identify what can be reused
HENGDE’s 2024 retrofit guides discuss adapting material preparation, mixing, moulds, curing and cutting. Inspect the existing machines and facilities before deciding their role in the new route. Aggregate grading, product geometry and material handling may require changes that are not visible in an outline layout.
Agree a phased implementation plan
Document retained equipment, new machinery, site works, utilities, shutdown arrangements and responsibilities. Validate the materials and curing route before commissioning the full line. A conversion should finish with agreed product and operating tests; generic energy-saving or investment claims are not a substitute for a site-specific scope.
Explore related HENGDE equipment and project options, or send your product and factory requirements.
Discuss your production line project with HENGDE.
Share your product, project location, target output and available materials with the HENGDE team.
Discuss Your Project

