Language

PROJECT CASE

South Africa 200 m³/day EPS self-insulating block line

The project record identifies a 200 m³/day design basis for EPS self-insulating blocks and includes site media for mould circulation, cutting and finished products. Actual operating results depend on materials, formulation, shifts and site conditions.

Independent engineeringEquipment manufacturingProject delivery
REAL SOUTH AFRICA PRODUCTION MEDIAFinished products and connected equipment from the project
Finished EPS self-insulating blocks at the South Africa project site
HENGDEProject-specific configuration
01
PROJECT MEDIA

Moulding, cutting and finished-product media

Connected EPS block production line at the South Africa project site REAL PROJECT-SITE PHOTO
01

Connected production line

The site overview shows production equipment installed along the transfer route.

EPS lightweight block cutting equipment at the South Africa project site REAL CUTTING EQUIPMENT
02

Cutting section

The cutting area is shown as part of the project rather than as a generic equipment image.

Mould circulation and fresh EPS material at the South Africa project site REAL MOULDING PROCESS
03

Mould circulation

Site media records moulds and fresh material within the production route.

Finished EPS self-insulating blocks after cutting at the South Africa site REAL FINISHED PRODUCT
04

Finished EPS blocks

Finished EPS self-insulating blocks at the customer factory show the product after cutting.

02
CAPACITY BASIS

Engineering the complete production cycle

The 200 m³/day figure belongs to the project. Final daily output depends on the confirmed formula, product sizes, mould cycle, curing, cutting rhythm, shifts and operating management.

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page