SERVICE STAGE 02

Capacity and layout planning

HENGDE engineers the batch rhythm, mould circulation, curing, cutting and logistics together, turning your output target into a workable factory layout.

Delivery lead time: 40–50 working days.

HENGDE lightweight block and wall-panel production equipment
HENGDE lightweight block and wall-panel production equipment

How HENGDE advances your project

Target product and daily output basis

We define the target product, shift hours and design-output basis with your team.

Cycle-time and bottleneck review

We calculate how batching, mould turnover, curing, cutting and handling affect the line rhythm.

Workshop, curing, roads and storage

We arrange production, curing and storage areas with access for operators, forklifts and maintenance.

Power, water, air and labour interfaces

We identify the electrical, water, compressed-air and staffing interfaces for the selected configuration.

What this stage delivers

Capacity basis

A stated shift and cycle-time basis for engineering the line.

Factory arrangement

A layout connecting equipment positions, mould circulation, curing and material movement.

Utility interfaces

The supply points and requirements to coordinate with local contractors.

Site-preparation plan

The foundations, access and installation interfaces to prepare before equipment arrival.

Planning a Lightweight Block or Wall Panel Project?

DISCUSS YOUR PROJECT

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

Build the production process around your local materials

RAW MATERIAL ENGINEERING

HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.

Understand your local materials

HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.

For recycled or variable inputs, representative samples and production trials establish how that specific source performs.

Turn trial results into a production method

We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.

The equipment proposal then follows the tested process and the required product, rather than a generic machine list.

Discuss your project

Tell us about your project.

A few details give our team the right starting point for your production line proposal.

Delivery lead time: 40–50 working days.

WhatsApp HENGDE+86 159 8637 7799Opens WhatsApp. No message is sent automatically.

WhatsApp is required. Email is recommended for receiving quotations and technical information.

Choose a calling code or enter a full international number. It may differ from your project country.
Add project details Optional — helps us prepare your configuration
Enter a positive amount, or leave blank. Pasting “200 m³ per day” also works.

Share only information you are permitted to provide. By submitting, you agree to the Privacy Policy. Fields marked * are required.