Language

SMALL & MEDIUM LINES FIRST

Lightweight Block Production Lines by Capacity

Delivery lead time: 40–50 working days.

Start with HENGDE's 30, 50, 100 and 200 m³/day configurations for small and medium factories. Higher-output project references remain available when the market and factory plan require them.

HENGDE lightweight block production equipment at the Cote d Ivoire customer project
REAL HENGDE BLOCK PROJECT
30–1000 m³/dayPublished block capacities
CLC / NAAC / SpecialProcess routes
BOM + LayoutConfiguration evidence

CHOOSE A CAPACITY

Small and medium block-production lines first

Compare 30, 50, 100 and 200 m³/day design-capacity configurations, then explore larger systems. HENGDE develops the mould circulation, cutting and handling plan around your product and shift schedule.

HENGDE 30 cubic metre per day compact lightweight block production line engineering layout
SMALL / MEDIUM PRIORITY · 30 m³/day

30 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 3.75 m³/hour hourly planning output
  • 8 equipment items
  • 26.55 kW listed total
View layout, equipment and inquiry →
50 cubic metre square-mould physical-foaming lightweight block line engineering layout
SMALL / MEDIUM PRIORITY · 50 m³/day

50 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 6.25 m³/hour hourly planning output
  • 15 equipment items
  • 80.35 kW listed total
View layout, equipment and inquiry →
100 cubic metre per day lightweight block production line engineering layout
SMALL / MEDIUM PRIORITY · 100 m³/day

100 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 12.5 m³/hour hourly planning output
  • 24 equipment items
  • 116.35 kW listed total
View layout, equipment and inquiry →
Engineering layout of the 200 m³/day lightweight block line
SMALL / MEDIUM PRIORITY · 200 m³/day

200 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 25 m³/hour hourly planning output
  • 25 equipment items
  • 154.75 kW listed total
View layout, equipment and inquiry →
300 cubic metre per day CLC block production line engineering layout
HIGHER-OUTPUT REFERENCE · 300 m³/day

300 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 37.5 m³/hour hourly planning output
  • 25 equipment items
  • 179.65 kW listed total
View layout, equipment and inquiry →
400 cubic metre per day lightweight block production line engineering layout
HIGHER-OUTPUT REFERENCE · 400 m³/day

400 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 50 m³/hour hourly planning output
  • 26 equipment items
  • 215.85 kW listed total
View layout, equipment and inquiry →
HENGDE lightweight block production equipment assembly shown for the 600 cubic metre line scope
HIGHER-OUTPUT REFERENCE · 600 m³/day

600 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 75 m³/hour hourly planning output
  • 27 equipment items
  • 251.25 kW listed total
View layout, equipment and inquiry →
HENGDE lightweight block production equipment assembly shown for the 1000 cubic metre line scope
HIGHER-OUTPUT REFERENCE · 1000 m³/day

1000 m³/day CLC Block Production Line

CLC / foam concrete block production using physical foaming and non-autoclaved curing

  • 125 m³/hour hourly planning output
  • 31 equipment items
  • 510.4 kW listed total
View layout, equipment and inquiry →

Turn Building Requirements into Production Requirements

Start with the block your project needs. The information below helps HENGDE review product requirements, material trials, equipment interfaces and preliminary layout needs. Final process and equipment choices depend on project-specific review.

Project inputWhat to sendHow it shapes the production line
Wall function and project drawingsIntended wall use, installation location and relevant drawings or specifications provided by your project designer.These help identify the intended block application, product requirements and handling questions that need clarification.
Block dimensions and finishTarget length, width and height; sample photos or drawings showing surface finish and edge profiles.These guide the review of mould options, cutting arrangements and any finishing equipment required for the selected product.
Product tests and applicable standardsStandards and test methods specified for your project, together with available product test reports or requirements from the project designer.These help identify required test evidence and questions for material or product trials. Equipment selection alone does not demonstrate product compliance.
Available raw materialsProposed binder, mineral material and process-water sources, where applicable, with supplier details, photographs and available material test reports.These inform sampling requirements and the review of storage, metering, mixing and other process interfaces.
Production demand and output basisRequired block types, expected order patterns, target daily design output and proposed operating hours, subject to project confirmation.These provide a starting point for assessing batching, mixing, mould circulation, curing, cutting and handling capacity, as applicable to the selected production route.
Factory and site constraintsAvailable site plans, usable building dimensions, access routes, utilities and existing equipment.These help review equipment arrangement, material movement, utility connections and customer-prepared works.

Review our raw-material assessment service for material-related inputs, and capacity and layout planning for output and site requirements. HENGDE uses the reviewed information to discuss a project-specific equipment supply scope.

PROJECT DELIVERY / TURNKEY SUPPORT

From local materials to an operating factory

HENGDE connects raw-material testing, factory planning, equipment manufacturing and site commissioning in one delivery plan. Our engineers develop the production route and machine interfaces, and our team prepares operators for production and maintenance. The proposal identifies the equipment, site preparation and services for your factory.

  1. 01

    Raw Material Testing

    Evaluate representative samples from the project location before selecting the final process.

  2. 02

    Formula Adjustment

    Adjust the formulation and material ratios against the test results and target product.

  3. 03

    Product & Process Selection

    Confirm product dimensions and the product-specific preparation, forming, curing and finishing process.

  4. 04

    Factory Layout Planning

    Coordinate land, buildings, storage, material flow, foundations and utilities.

  5. 05

    Production Line Customization

    Match capacity, automation, budget, moulds and process interfaces to the agreed factory scope.

  6. 06

    Equipment Manufacturing

    Prepare the agreed machines, tooling and controls against the approved configuration.

  7. 07

    Factory Acceptance

    Check applicable equipment and delivery scope before shipment.

  8. 08

    Packing & Shipping

    Coordinate packing, loading and destination requirements with the project shipping plan.

  9. 09

    Site Installation

    Install and connect the agreed equipment after site conditions are ready.

  10. 10

    Commissioning

    Check machine sequences and trial production with the selected materials.

  11. 11

    Operator Training

    Train operators in safe use, production sequence and routine maintenance.

  12. 12

    After-sales & Spare Parts

    Plan maintenance communication and spare-parts support for the installed equipment.

Not sure which capacity fits your factory?

Send your target block, project country, raw materials and planned output. HENGDE will use the complete project form to review the appropriate line direction.

Plan Your Factory
RAW MATERIAL ENGINEERING

Build the production process around your local materials

HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.

Understand your local materials

HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.

For recycled or variable inputs, representative samples and production trials establish how that specific source performs.

Turn trial results into a production method

We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.

The equipment proposal then follows the tested process and the required product, rather than a generic machine list.

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page