Language

PRODUCTS

Lightweight Block & Wall Panel Products

Start with one of two product families. Compatible products and process routes are then reviewed against the building use, local materials and required factory output before equipment is selected.

Independent engineeringEquipment manufacturingProject delivery
REAL HENGDE FACTORYProduction equipment configured around the intended wall product
Hengde lightweight wall-material production equipment assembled in the factory
HENGDEProject-specific configuration
2Product families
12Compatible product types
Product firstSelection principle
02
PROJECT INFORMATION

Information Required for Production-Line Selection

01 01

Product Requirements

Product type, dimensions, density, compressive-strength target, surface finish, joints and reinforcement requirements.

02 02

Raw Materials

Cement or binder, sand, stone powder, fly ash, tailings, EPS, ceramsite and other available materials.

03 03

Production Process

Physical foaming, chemical aeration, moulding, curing, cutting and handling requirements.

04 04

Factory Requirements

Target output, operating hours, mould cycle, curing time, available power and water, workshop space and site logistics.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project
RAW MATERIAL ENGINEERING

Build the production process around your local materials

HENGDE connects raw-material assessment, sample trials and equipment engineering to develop a practical production route for your factory.

Understand your local materials

HENGDE reviews grading, moisture, composition and supply consistency against the block or panel you want to manufacture.

For recycled or variable inputs, representative samples and production trials establish how that specific source performs.

Turn trial results into a production method

We use the results to develop material ratios, dosing, mixing, forming, curing and finishing requirements.

The equipment proposal then follows the tested process and the required product, rather than a generic machine list.

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page