South Africa Customer Signs a Self-Insulating Block Line Agreement Online
A South African customer signed a HENGDE self-insulating block line agreement online on 13 June 2025, following an earlier factory inspection.

Technical work continued after the visit
The source records an on-site inspection on 28–29 April and further refinement of the technical proposal before signing. The online agreement followed that process rather than replacing the equipment assessment.

Keep the implementation stages distinct
The agreement establishes cooperation on the production-line project. Equipment manufacturing, shipment, installation and commissioning remain separate stages. Product requirements, material compatibility, site preparation and acceptance conditions should continue to guide implementation.
Review related HENGDE solutions and send the requirements for your factory.
Prepare the agreed engineering and manufacturing inputs
Confirm drawings, material information, interfaces and the delivery responsibilities defined for the signed project.
Discuss Your Project

