By Air, Road and Boat: HENGDE Installation Support in Indonesia
Plane, road, then boat. For this lightweight block project in Indonesia, reaching the customer's site meant changing transport several times after leaving China.

Project at a glance
- Project Country
- Indonesia
- Product
- lightweight block
- Project Stage
- work centres on bringing equipment into position and preparing installation
Journey to the Indonesian Project Site
Project Background
HENGDE’s engineer made that journey to support the equipment work on site. The latest project photographs and video show the premises, access routes and equipment being moved into position.

Practical Site Preparation for Installation
Installation Work
When machinery reaches a factory site, the next job is not simply to find an empty space for each machine. The team needs to look at where equipment can be brought in, how it will be positioned and how the stages of the line will connect.
In the project footage, people work around the cutting equipment as it is moved through the premises. Other views show the available building space. At this stage, the work centres on bringing equipment into position and preparing installation.

Checking Local Conditions for Installation
Commissioning and Training Preparation
Equipment positions, connections between processes and the arrangements for installation and commissioning need to be checked against local conditions. A plan discussed before shipment still has to be put into practice at the customer’s premises.
That is why support for an overseas project continues after dispatch. For this Indonesian customer, the engineer’s journey connects the equipment shipment with the work taking place at the site.

Planning Your Own Lightweight Block Project
Planning Your Own Lightweight Block Project
Planning a lightweight block factory? Start with the proposed country, available raw materials, intended products, site information and target daily output. These details help HENGDE discuss an equipment plan and the installation and technical support the project needs.
REAL PHOTO GALLERY
Published project and event references


Prepare commissioning and operator training
Confirm utilities, safety checks, trial-production materials and the operators who will receive equipment training.
Get a Production Line Proposal

