Kashgar Customer Chooses a Cutting-System Upgrade for Self-Insulating Blocks
A Kashgar customer agreed a HENGDE cutting-system renovation plan after encountering dimensional variation, cutting waste and production difficulties on an existing block line.

Diagnose the process bottleneck
The source published in January 2026 describes problems with a circular-saw process and the customer’s search for a workable upgrade. The proposed focus was the cutting stage, rather than an assumption that the entire factory required replacement.

Set the retrofit acceptance conditions
The solution discussed rotary band-saw cutting and coordinated horizontal and vertical cuts. Product dimensions, green-body condition, cutting surfaces, handling interfaces and the operating schedule need to be checked for the specific factory. This report records agreement on a renovation plan, rather than completion of installation or proof of a universal increase in output.
Explore related HENGDE production solutions or discuss your project requirements.
Prepare the agreed engineering and manufacturing inputs
Confirm drawings, material information, interfaces and the delivery responsibilities defined for the signed project.