Language

SIGNING

Ordos Customer Signs a Lightweight Block Production Line Agreement

A solid-waste recycling enterprise in Ordos signed a HENGDE lightweight block production-line agreement reported in July 2025 as a 300 m³/day project.

Published
Author
HENGDE Editorial Team
Ordos Customer Signs a Lightweight Block Production Line Agreement — source image 1
REAL EVENT / PROJECT REFERENCE

Connect the investment with the material route

The agreement concerns a planned lightweight block line and the customer’s solid-waste utilisation direction. Actual materials and their processing requirements need to be validated before a production formula is selected.

Ordos Customer Signs a Lightweight Block Production Line Agreement — source image 2

Translate the agreed capacity into implementation

The equipment scope, operating schedule, mould cycle, curing space and finished-product handling should be defined in the project documents. The report marks contract signing; shipment, installation and qualified production are subsequent stages and need their own evidence.

Review related HENGDE solutions and send the requirements for your factory.

YOUR NEXT STEP

Prepare the agreed engineering and manufacturing inputs

Confirm drawings, material information, interfaces and the delivery responsibilities defined for the signed project.

Discuss Your Project

More from HENGDE

View all news

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page