Aksu Customer Agrees a Six-Metre AAC Mould Retrofit for Self-Insulating Blocks
A February 2025 HENGDE report describes an agreement to adapt an existing six-metre AAC mould route for a self-insulating block project in Aksu, Xinjiang.

Plan around the existing equipment
The conversion concerns a factory with established equipment and a different intended product route. Mould geometry, green-body handling, cutting and curing arrangements need to be assessed together.

Separate agreement from operating evidence
The signing establishes the project scope at that stage. Equipment dispatch, site installation and production checks should be documented subsequently. The source’s national-first description is not used as an independently verified ranking.
Review related HENGDE solutions and send the requirements for your factory.
Prepare the agreed engineering and manufacturing inputs
Confirm drawings, material information, interfaces and the delivery responsibilities defined for the signed project.
Discuss Your Project

