Delivery lead time: 40–50 working days.
HANDLING & STACKING
Wall-panel transfer car
Transfers moulds or products between the listed production stages.
Compare line configurations
Real equipment photos and engineering views
Model, dimensions, power, weight and function
STANDARD EQUIPMENT PARAMETERS
HENGDE provides the equipment weight for the selected model and supply configuration in the project equipment and packing schedules.
| Variant | Model | Dimensions | Rated power | Reference weight | Function |
|---|---|---|---|---|---|
| 80 m³/day configuration | HDBD-001 | 3 m × 1.5 m | 1.2 kW | — | Transfers moulds or products between the listed production stages. |
| 500 m³/day configuration | HDBD-001 | 3 m × 1.5 m | 3 kW | — | Transfers moulds or products between the listed production stages. |
Reference parameters describe the listed equipment model. Final interfaces, voltage, quantity and delivered configuration are confirmed in the project quotation and engineering drawings.
Configuration options by production line
PRODUCTION-LINE CONFIGURATIONS
The highlighted row matches the production line you selected. Final model, dimensions, quantity and power are confirmed during project engineering.
| Production line | Model | Dimensions | Qty. | Unit power | Total |
|---|---|---|---|---|---|
| 80 m³/day → | HDBD-001 | 3 m × 1.5 m | 5 | 1.2 kW | 6 kW |
| 150 m³/day → | HDBD-001 | 3 m × 1.5 m | 5 | 1.2 kW | 6 kW |
| 200 m³/day → | HDBD-001 | 3 m × 1.5 m | 8 | 1.2 kW | 9.6 kW |
| 500 m³/day → | HDBD-001 | 3 m × 1.5 m | 10 | 3 kW | 30 kW |
Return to the corresponding capacity
USED IN THESE PRODUCTION LINES
80 m³/day
HDBD-001 · 5
Back to production-line equipment → Lightweight wall panel production150 m³/day
HDBD-001 · 5
Back to production-line equipment → Lightweight wall panel production200 m³/day
HDBD-001 · 8
Back to production-line equipment → Lightweight wall panel production500 m³/day
HDBD-001 · 10
Back to production-line equipment →Discuss this equipment in a complete production line
Send the target product, planned output, raw materials and project location. HENGDE will match the equipment to the complete factory configuration.
Discuss your project
Tell us about your project.
A few details give our team the right starting point for your production line proposal.
Delivery lead time: 40–50 working days.

