Location
Côte d’Ivoire
A separate Côte d’Ivoire customer signed for a HENGDE lightweight block line on 23 October 2025; the published case includes equipment shipment and installation records.
The customer reviewed equipment, finished-product quality and suitability for local operating conditions before signing. The source describes a planned 200 m³/day line and records several stages of project development. The nominal capacity is part of the reported project scope, not independent proof of sustained output. This case is kept separate from the other Côte d’Ivoire block-and-wall-panel project with a different equipment scope.
Côte d’Ivoire
Lightweight concrete blocks
Shipment and installation documented
The source explicitly dates the equipment cooperation agreement.
The published project record includes an equipment-dispatch section.
Site-installation images are included in the source case. The project’s operating schedule and qualified production results are not specified here.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
REAL PROJECT MEDIA Real media from this HENGDE customer project.
Equipment for the reported lightweight concrete block project.
The source describes 200 m³/day; shift duration and acceptance conditions require the actual project documents.
Equipment positions, site works, commissioning and operator preparation need to be coordinated locally.
Tell us what you plan to produce and where the factory will be built.