Ordos 300 m³/day NAAC block production line

The Ordos customer project is designed for 300 m³/day of non-autoclaved aerated concrete blocks. HENGDE’s equipment connects the production stages, mould handling and finished-block movement at the customer factory.

Independent engineeringEquipment manufacturingProject delivery
REAL ORDOS PROJECT MEDIAConnected line equipment and finished blocks from the shown Ordos project
Finished NAAC blocks in the handling section of the Ordos production line
HENGDEProject-specific configuration
01
PROJECT MEDIA

Connected equipment, mould handling and finished blocks

Connected NAAC block production equipment at the Ordos project site REAL PROJECT-SITE PHOTO
01

Connected production line

The project overview records cutting, transfer and downstream handling equipment inside the Ordos factory.

Moulded NAAC block material in the handling section of the Ordos production line REAL MOULDING PROCESS
02

Mould handling

Separate site media shows moulded lightweight material within the connected handling route.

Finished NAAC blocks at the Ordos project site REAL FINISHED PRODUCT
03

Finished blocks

Finished NAAC blocks are shown beside the downstream equipment at the Ordos factory.

02
CAPACITY BASIS

The 300 m³/day value belongs to this project record

Actual daily production depends on confirmed raw materials, block dimensions, curing, cutting rhythm, shifts and operating management. HENGDE balances these conditions across mould circulation, cutting and downstream handling in the factory plan.