Connected factory line
The elevated site view records the installed transfer, cutting and handling areas inside the Xianning factory.
The Xianning project record covers a combined lightweight block and partition-wall-panel line. The contract was signed in July 2024, equipment reached final installation and commissioning at the end of December, and the supplied record identifies February 2025 as the production-start milestone.
The elevated site view records the installed transfer, cutting and handling areas inside the Xianning factory.
Separate project media shows moulded lightweight material entering the cutting equipment.
Finished partition wall panels are shown in the Xianning customer factory’s downstream handling area.
The Xianning project has a design basis of 500 m³/day for blocks and 200 m³/day for partition wall panels. Actual output depends on the product mix, materials, curing, mould cycle, shifts and operating conditions.