
Horizontal mixer variants
Combines the confirmed solids, water and route-specific lightweight constituent according to the approved batch sequence.
EPSA-1 · ADF-01 · EPSJB-01 · EPSJB-02 · EPSKH-02 · EPSJB-04View device and line configurations →EQUIPMENT PROCESS CATEGORY
Delivery lead time: 40–50 working days.
Browse the equipment in this process stage and open any item to review its role in compatible production-line configurations.

Combines the confirmed solids, water and route-specific lightweight constituent according to the approved batch sequence.
EPSA-1 · ADF-01 · EPSJB-01 · EPSJB-02 · EPSKH-02 · EPSJB-04View device and line configurations →
Prepares physical foam for a confirmed CLC foam-concrete route; it is not an aluminium-powder NAAC machine.
HDKWF1-001View device and line configurations →
Supplies compressed air to the confirmed foaming and pneumatic scope; the 50 and 100 m³/day references use different variants.
HDKY-001View device and line configurations →
Buffers prepared material while supporting the connected batch rhythm.
HDSU-2View device and line configurations →
Prepares selected materials before final mixing in the high-output reference route.
HDLS-001 · HDLS-002View device and line configurations →
Transfers compatible mixed slurry to the confirmed pouring position.
HDBD2-005View device and line configurations →