Positioning
Place equipment against the approved layout and safe access requirements.
The Côte d’Ivoire project progressed from equipment delivery into site installation. Published work includes positioning, rail installation, equipment connection and core assembly.
Place equipment against the approved layout and safe access requirements.
Align mould circulation, transfer routes and drive components.
Coordinate material, cutting, handling, controls and utilities.
Commissioning, operator training, trial production and acceptance follow the installation record.
HENGDE’s on-site work connects equipment positioning, rails and machine interfaces. Commissioning then brings together no-load checks, material trials, product inspection and operator training.