PROJECT CASE

Indonesia foam-concrete block line: from factory visit to shipment

The customer visited HENGDE on 18 April 2026, signed the equipment agreement on 19 April and progressed to equipment loading on 7 July. HENGDE’s next delivery steps cover installation, commissioning and operator training after arrival and site preparation.

Independent engineeringEquipment manufacturingProject delivery
REAL INDONESIA SHIPMENT MEDIAEquipment loading shown on 7 July 2026
Foam-concrete block production equipment loaded into a container for the Indonesia project
HENGDEProject-specific configuration
01
PROJECT MILESTONES

Three milestones, each kept within its real stage

Indonesia project representative reviewing a lightweight block sample during the factory visit REAL FACTORY-VISIT MEDIA
FACTORY VISIT 01

Product and equipment review

The customer team reviewed production equipment and a lightweight block sample at HENGDE on 18 April 2026.

CONTRACT 02

Project scope confirmed

The project records contract signing on 19 April 2026. Commercial terms are not published on this page.

Production equipment secured inside a shipping container for the Indonesia project REAL LOADING MEDIA
SHIPMENT 03

Equipment loaded

The shown equipment scope entered the shipment stage on 7 July 2026.

LATER STAGES 04

Installation and production are separate

After delivery, HENGDE connects site installation, equipment checks and material trials with operator training.

02
PROJECT SCOPE

Preparing the site for HENGDE equipment

The final line arrangement follows the contracted product, raw materials, site utilities, workshop access and agreed equipment scope. HENGDE coordinates the equipment and site-preparation plan for the next installation stage.

Project milestones

  1. Factory visit
  2. Contract signing
  3. Equipment loading