Language

HENGDE CUSTOMER PROJECT

Côte d’Ivoire 200 m³/day Lightweight Block Line Project

A separate Côte d’Ivoire customer signed for a HENGDE lightweight block line on 23 October 2025; the published case includes equipment shipment and installation records.

REAL PROJECT MEDIAOriginal image from the HENGDE customer-project record.
Côte d’Ivoire 200 m³/day Lightweight Block Line Project — original source project photo 1
HENGDEProject-specific configuration
Côte d’IvoireProject location
Lightweight concrete blocksTarget product
200 m³/day planned project capacityProject capacity
Shipment and installation documentedPublished stage
01
PROJECT OVERVIEW

Project scope and published evidence

The customer reviewed equipment, finished-product quality and suitability for local operating conditions before signing. The source describes a planned 200 m³/day line and records several stages of project development. The nominal capacity is part of the reported project scope, not independent proof of sustained output. This case is kept separate from the other Côte d’Ivoire block-and-wall-panel project with a different equipment scope.

01

Location

Côte d’Ivoire

02

Product direction

Lightweight concrete blocks

03

Current published stage

Shipment and installation documented

02
PROJECT TIMELINE

Documented project stages

01

Project agreement — 23 October 2025

The source explicitly dates the equipment cooperation agreement.

02

Equipment shipment

The published project record includes an equipment-dispatch section.

03

Installation record

Site-installation images are included in the source case. The project’s operating schedule and qualified production results are not specified here.

03
REAL PROJECT MEDIA

Photos from this customer project

Côte d’Ivoire 200 m³/day Lightweight Block Line Project — original source project photo 1 REAL PROJECT MEDIA
01

Côte d’Ivoire project media 1

Real media from this HENGDE customer project.

Côte d’Ivoire 200 m³/day Lightweight Block Line Project — original source project photo 2 REAL PROJECT MEDIA
02

Côte d’Ivoire project media 2

Real media from this HENGDE customer project.

Côte d’Ivoire 200 m³/day Lightweight Block Line Project — original source project photo 3 REAL PROJECT MEDIA
03

Côte d’Ivoire project media 3

Real media from this HENGDE customer project.

04
PRODUCTION & EQUIPMENT SCOPE

Equipment direction documented for this project

01

Block line scope

Equipment for the reported lightweight concrete block project.

02

Planned output

The source describes 200 m³/day; shift duration and acceptance conditions require the actual project documents.

03

Implementation support

Equipment positions, site works, commissioning and operator preparation need to be coordinated locally.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page