Malaysia AAC Producer Examines Mould-Forming Block Equipment
A Malaysian property-development customer visited HENGDE on 3 July 2025 to inspect mould-forming block equipment and discuss a possible production change.

Review the existing operation first
The source states that the customer already operated an AAC line supplying construction projects. The visit explored another block-production approach and the equipment needed for it.

Define the new product and reusable facilities
A factory review should distinguish the intended mould and block geometry, raw-material route, curing needs and cutting or finishing operations. Existing AAC machinery should not be assumed compatible without a technical survey. The visit is an equipment assessment and does not establish a completed conversion.
Review related HENGDE solutions and send the requirements for your factory.
Confirm the reviewed product and project inputs
Use the visit findings to confirm the product, raw materials, target output and next engineering review.
Discuss Your Project

