Xinjiang Hejing Self-Insulating Block Line Upgrade

The Hejing customer adapted an existing AAC factory for self-insulating-block production.

REAL PROJECT MEDIAReal equipment and customer-site media from the Hejing line upgrade.
Xinjiang Hejing Self-Insulating Block Line Upgrade - real project image 1
HENGDEProject-specific configuration
Hejing, Bayingolin, Xinjiang, ChinaProject location
Self-insulating blocksTarget product
Existing-line upgradeProject stage
01
PROJECT OVERVIEW

Customer project and HENGDE scope

The Hejing customer adapted an existing AAC factory for self-insulating-block production. HENGDE’s upgrade work connected the revised product route with cutting equipment and the production stages retained in the factory.

01

Location

Hejing, Bayingolin, Xinjiang, China

02

Product direction

Self-insulating blocks

03

Project stage

Existing-line upgrade

02
PROJECT TIMELINE

Project milestones

01

Existing AAC line review

The customer’s existing production line was assessed for an upgrade.

02

Product-route upgrade

The project moved toward self-insulating block production.

03

Cutting-system work

Published media documents cutting equipment associated with the upgrade.

03
REAL PROJECT MEDIA

Photos from this customer project

Xinjiang Hejing Self-Insulating Block Line Upgrade - real project image 1 REAL PROJECT MEDIA
01

Hejing, Bayingolin, Xinjiang, China project media 1

Real media from this HENGDE customer project.

Xinjiang Hejing Self-Insulating Block Line Upgrade - real project image 2 REAL PROJECT MEDIA
02

Hejing, Bayingolin, Xinjiang, China project media 2

Real media from this HENGDE customer project.

Xinjiang Hejing Self-Insulating Block Line Upgrade - real project image 3 REAL PROJECT MEDIA
03

Hejing, Bayingolin, Xinjiang, China project media 3

Real media from this HENGDE customer project.

Xinjiang Hejing Self-Insulating Block Line Upgrade - real project image 4 REAL PROJECT MEDIA
04

Hejing, Bayingolin, Xinjiang, China project media 4

Real media from this HENGDE customer project.

04
PRODUCTION & EQUIPMENT SCOPE

Production equipment and engineering

01

Existing-line retrofit

The project reuses and upgrades the customer’s existing factory.

02

Self-insulating block cutting

Cutting and related production stages support the revised product direction.

DISCUSS YOUR PROJECT

Planning a Lightweight Block or Wall Panel Project?

Tell us what you plan to produce and where the factory will be built.

Discuss Your Project

IP Geolocation by DB-IP · CC BY 4.0

WhatsAppDiscuss this page